China Precast Magnet

Precast Concrete Accessories

Ronglong town’s first new type of precast farmer’s house landed

That afternoon, the relevant principals of the district housing and Urban Rural Development Commission and Ronglong town also made a special trip to Chen ganghuo’s house to guide the house construction on site.

Fixing Socket Angular End

Next, the main body of the house will be completed by the end of June, and then a series of decoration works such as exterior wall and interior decoration will be carried out.

This is also the first new type of precast peasant house in Ronglong town.

At the same time, Ronglong town will widely promote the concept of precast architecture and the use of precast materials in the whole town..

With the roar of large cranes, the housing frame has begun to take shape in less than half a month.

“The construction of precast houses is not only fast, but also energy-saving, environmental protection and safety.” According to the relevant person in charge of Ronglong Town, the house structure is 10 times better than the traditional wall insulation performance, the material reuse rate reaches 80% – 90%, the main construction period is shortened to about 45-60 days, and the seismic performance reaches grade 8.

Different from the cast-in-situ concrete structure in the past, this three-story residence covering an area of 180 square meters is built with assembled integral concrete structure.

On May 10, Chen ganghuo, a villager of group 7, Baixiang village, Ronglong Town, and the workers stepped up the construction of their own houses.

Related Posts