Focus on this official account to release updates at 7:00 or 11:11; It is committed to the full release of the policy guidance of the
The project is located in the South Zone of high tech Industrial Park in Nanshan District, Shenzhen, south of Gaoxin South 6th Road and north
Implement green construction in the whole process of project construction, improve the management system of building demolition, and put an end to large-scale demolition and
the enterprise that obtained the comprehensive supervision qualification in that year will be rewarded with 1million yuan, and the enterprise that obtained the grade a
4. The fire prevention measures of steel structure buildings are divided into active fire prevention and passive fire prevention. The National Grand Theater successfully applied
After the construction of cast-in-place frame beam and frame column is completed, the construction of cast-in-place frame beam shall be started, including supporting bottom formwork,
Assist the project manager in project follow-up, drawing, sorting out the quotation list, etc; Job requirements: 1. Major in industrial design and related design, college
It is hereby notified. Official account that precast building practitioners should pay attention to 1. 2、 The main contents are as follows: from the date
Lifting Socket Technical specification for application of precast steel structure building floor in Shandong db37/t5180-2021 technical specification for application of precast steel structure building floor
MCC Lvjian precast steel-concrete structure system < < slide left view > > MCC Lvjian precast steel-concrete structure residential system is based on concrete-filled steel