China Precast Magnet

Precast Concrete Accessories

40% cast! Notice of Quanzhou three departments on accelerating the industrialization of new buildings

The active development of precast buildings is an important starting point in the construction field to promote the realization of the “double carbon” goal.

According to this development target plan, it is determined that the proportion of precast buildings in the area of newly-built civil buildings (including the supporting civil buildings in the nature of non civil building land) in the city from 2022 to 2023 will be 30%, of which the proportion of precast buildings with one star and above will reach more than 15%; From 2024 to 2025, the precast buildings in the city accounted for 40% of the newly-built civil building area in that year, among which the precast buildings of one star and above should account for more than 30%; The precast area of construction projects that provide land by means of allocation or land agreement transfer should account for 100%; The structures and supporting auxiliary facilities (garbage room, power distribution room, etc.) independently constructed in the project may not use precast buildings, which should be constructed first.

accelerate the pilot of industrialization of new buildings.

If the calculation of the original fitting rate of precast buildings changes due to design changes, the modified fitting rate shall not be lower than the original fitting rate standard, and a new application for recognition shall be made.

strengthen the early approval management of precast buildings.

According to the spirit of Min Jian Zhu [2021] No.

II.

strengthen the management of the construction process of precast buildings.

Click the blue word to pay attention to our notice of Quanzhou housing and Urban Rural Development Bureau and other three departments on accelerating the industrialization of new buildings.

increase the proportion of precast buildings in the new construction area.

Strengthen the promotion of precast buildings in state-owned investment and financing projects.

The development and reform department shall, in accordance with the prescribed authority, strengthen the examination of government investment projects using precast buildings, and verify the project estimate (budget estimate) according to the relevant pricing standards.

The relevant competent departments of each county (city, district) refer to the listing mode of municipal government investment projects for management, and the investment projects of state-owned enterprises at all levels refer to government investment projects for implementation.

If the proportion of precast building area in the land transferred by the state before 2022 is not clear, it shall be implemented by reference.

IV.

Fixing Socket Cross Pin

I.

If it is found that the subject responsible for the quality of precast construction projects violates laws, regulations and mandatory standards and fails to perform the legal quality responsibilities and obligations, it shall urge the relevant units to rectify and investigate according to law..

There will be no less than two pilot projects from 2022 to 2023, and the number will increase steadily year by year (see Annex 1 for details).

The competent department of housing and construction shall include the construction of precast construction projects into the scope of project quality and safety supervision, focus on whether the construction is carried out according to the reviewed and qualified construction drawing design documents, and strengthen the supervision of the implementation of precast construction projects in real estate.

From 2022, state-owned investment and financing projects with a total construction area of more than 5000 square meters should adopt precast buildings, and promote the application of precast steel structure system, vertical precast shear wall system, precast decoration system, intelligent construction technology, green building materials and other new building industrialization technologies.

We will carry out pilot projects for the industrialization of new buildings in combination with the local resource endowment and industrial foundation, and promote the implementation of a number of high-quality demonstration projects.

When handling the new transfer of construction land, natural resource planning departments at all levels set the transfer conditions according to the new area proportion and assembly rate of precast buildings (see Annex 1 for details).

V.

20″), accelerate the development of new building industrialization industry in our city, and realize building industrialization, digitization, intellectualization, green and low-carbon transformation and upgrading, the provincial On the basis of the existing policies related to the implementation of new building industrialization in the city, the municipal housing and construction department, jointly with the development and reform, resource planning and other departments, further put forward relevant requirements for key work.

The Municipal Bureau of education, the Bureau of science and technology, the Bureau of industry and information technology, the Bureau of finance, the Bureau of human resources and social security, the audit bureau, the state owned assets supervision and Administration Commission, and the Financial Supervision Bureau, the Quanzhou regulatory branch of the China Banking and Insurance Regulatory Commission, Quanzhou urban construction group, culture and tourism group, transportation and development group, water group, financial holding group, and all counties (cities, districts) housing construction, development and reform Competent department of assets and regulations: in order to further implement the spirit of the implementation opinions of nine departments including Fujian Provincial Department of housing and urban rural development on accelerating the development of new building industrialization (min Jian Zhu [2021] No.

For the project adopting the precast decoration system, the design and construction integration can be used for separate contracting.

The newly-built state-owned investment and financing affordable housing and public construction projects should fully implement the assembly type full decoration.

The housing and construction department shall coordinate and determine the project list of precast buildings and inform the project construction unit, and require the project construction unit to clearly adopt the technical content of new building industrialization and reasonably calculate the project estimation (budget estimate) when preparing the feasibility study report and preliminary design, Report to the development and reform department for approval according to the procedure.

20) (hereinafter referred to as “Min Jian Zhu [2021] No.

All counties (cities, districts) should increase the promotion and application of precast steel structure system and precast decoration system for newly started affordable housing, education, medical treatment, office complex buildings, industrial parks, exhibition venues, industrial plants and other projects.

Luojiang District and Yongchun County focus on the prefabrication pilot of main vertical concrete components such as precast columns and vertical precast shear wall technology.

For government investment projects at the municipal level, the municipal development and reform department shall copy the three-year plan, annual plan and other relevant construction plans of government investment projects to the municipal housing and construction department.

From 2022 to 2023, there will be no less than 2 projects every year, and no less than 1 project in other counties (cities, districts).

III.

Please earnestly implement it.

With the consent of the municipal government, it is hereby printed and distributed to you.

The pilot project should select a structural system with reliable technology and high structural safety, and the adopted structural system technology should have the technical standards issued by the state, industry groups or Fujian Province.

20 document, the proportion of precast buildings in the city’s new construction area in 2025 must reach 40%.

From 2022 to 2023, there will be no less than 10 new pilot projects in the city, which will increase steadily year by year.

Related Posts