China Precast Magnet

Precast Concrete Accessories

The Municipal Bureau of housing and urban rural development investigates the precast decoration work

Shuttering Magnet

Contributed by: Energy Conservation Department editor: Gao Kun..

Government invested projects should be tried first and play a leading role in demonstration.

The time efficiency of assembling decoration is high, and the factory processing and assembling installation can greatly shorten the construction period on site; Green construction, energy saving and environmental protection are realized through the assembly dry construction method.

During the investigation and discussion, it was proposed that the development of precast decoration in our city should, first, strengthen research and learning, strengthen industry exchanges and cooperation, and enhance the public’s awareness of the advantages of developing green buildings and precast buildings in terms of quality, environmental protection, construction period, operation and maintenance; Second, coordinate and promote the development of the assembled decoration industry chain, introduce support policies, improve the technical system, participate in the revision of industrial standards, and promote technology promotion; Third, encourage practical application, create demonstration projects, and gradually expand the scale.

The dry construction method adopted for site installation will not cause secondary pollution, and there is no waste and pollution; The assembly construction is simpler than the traditional construction, and only the assembly is required on site, which saves a lot of on-site wet operation and secondary processing, and the construction efficiency is significantly improved; In the whole life cycle of the project, compared with traditional decoration, it can reduce carbon emissions; The decoration project is commercialized, and the quality, model, specification and design standard are unified; The comprehensive cost is low and the scale effect is obvious, which reduces the product cost and saves the labor cost.

Research on precast decoration work in order to promote the development of precast buildings in Xi’an and understand the development of precast decoration, the energy conservation department and decoration service center of the Municipal Bureau of housing and urban rural development went to Luan Town, Chang’an District to carry out research on precast decoration work.

The assembly decoration is the advocacy direction of the assembly building.

The assembly decoration is the decoration method of assembling and installing the parts and components produced by the factory on the site, mainly including the dry construction method building (ground), integrated kitchen, integrated toilet, pipeline separation, etc.

At present, due to the small market scale, insufficient supply of assembly workers, slightly higher price than traditional decoration, and the contradiction between personalization and scale, the assembled decoration is still in the initial stage, with great development space and broad prospects for large-scale development.

Related Posts