Guizhou ✔ notice on applying for the production base of precast buildings in Guizhou Province in 2022
54), the development and application of precast buildings in Guizhou Province should be effectively accelerated, and the positive role of pilot demonstration should be brought into full play, After study, it is decided to organize the application for the provincial precast building production base in our province in 2022.
In the past three years, there have been no major or above production safety accidents.
3、 Application process (I): the applicant shall fill in the application form of Guizhou precast building production base (Annex 1), prepare the application form of Guizhou precast building production base (Annex 2), fill in the letter of commitment of the applicant (Annex 3), and submit it to the county-level housing and Construction Department for preliminary review.
The county-level housing and construction department shall submit it to the municipal housing and construction department for review after approval and seal; The municipal housing and construction department shall report to our department for review and release after approval and seal; The application enterprise (unit) of Gui’an New Area shall be submitted to our department for review and release after being reviewed, approved and sealed by the housing and Construction Department of Gui’an new area.
If they still fail to meet the requirements within the specified rectification period, the qualification of the production base will be revoked..
The production enterprises of parts and components should have the intelligent automation production capacity, and the construction enterprises should have certain process methods and reach the corresponding construction technology level; (3) It has a modern enterprise management system and product quality control system, and has a good market reputation.
The scope of the declaration is the precast building design, construction, parts and components production, equipment manufacturing enterprises and scientific and technological research and development enterprises (units) registered in our province and with independent legal person status.
For enterprises that have failed to meet the application conditions or enterprises that have stopped or stopped production, our department will evaluate them and order them to make rectification within a time limit.
The design enterprises can apply the building information model (BIM) technology to carry out the forward design of precast buildings.
Fixing Socket Waved End Nail Plate
53), According to the spirit of the implementation opinions of the general office of the people’s Government of Guizhou Province on vigorously developing precast buildings (qfbf [2017] No.
(2) The application materials (paper seal and electronic version) shall be submitted to the building energy conservation and technology division of the Provincial Department of housing and urban rural development before September 30, 2022.
The relevant matters of the declaration are hereby notified as follows: 1.
The total number of precast construction engineering projects that design, construction and component production enterprises have participated in or applied to products is not less than 50000 square meters, the annual production of complete production lines of equipment manufacturing enterprises is not less than 5 (or the annual production is not less than 6), and the scientific and technological research and development enterprises (units) hold not less than 2 scientific research projects related to precast construction at provincial and ministerial levels; (2) It has advanced and mature precast building technology system.
The notice of the Department of housing and urban rural development of Guizhou Province on applying for the production base of precast buildings in Guizhou Province in 2022 is as follows: the housing and Urban Rural Development Bureau of each city (prefecture), the urban and Rural Development Bureau of Gui’an New District, the housing and Urban Rural Development Bureau of each county (city, district), and the relevant units: in order to implement the notice of the Ministry of housing and urban rural development and the national development and Reform Commission on printing and distributing the implementation plan of carbon peak in the field of urban and rural construction (JB [2022] No.
4、 Other (1) enterprises (units) included in the provincial-level precast building production base shall be preferentially recommended to apply for the national level precast building production base under the same conditions; (2) The housing and Urban Rural Development Bureau of each city (prefecture) and the Urban Rural Development Bureau of Gui’an new area are requested to “look back” on the enterprises that have obtained the provincial-level precast building production base and check whether they meet the application conditions.
2、 Conditions for application (1) having a strong ability in the precast construction industry.