China Precast Magnet

Precast Concrete Accessories

After watching the Japanese 50 story precast residential construction site, I was filled with emotion!

It seems that the construction deepening design should be done carefully! ▲ The wallboard transported to the floor for installation ▲ The balcony wallboard installed ▲ The node of the anti-seismic column installed ▲ The hook of the hanging electrical pipe line is directly attached to the precast floor without casing or bridge.

The hat is brand new, and the inside is also equipped with a disposable health guard, which is very hygienic and considerate! It is not like the black, sweaty and dusty safety helmet often seen on domestic construction sites.

Learn from the advanced, develop the building industrialization, and build Rundi, work hard together, come on! █ You will also like: ► The Green City is once again deeply shocked by Japanese industrial buildings! ► Inspiration from the in-depth investigation of the two giants of Japanese housing industrialization ► The production management of PC components in Japan was taken in real time, which was extremely detailed! (HD video) ► The Japanese site management, which is displayed 360 degrees without dead space, is full of dry goods! ► Japanese independent small houses are built with steel wood composite beams, which can withstand earthquake! Precast construction network real-time interactive WeChat “Precast gentleman”: 13327892019, join in group chat, consultation, exchange, contribution, cooperation Tel.: 0519-89881019; QQ group of private think tank on housing industrialization: 147874495..

After the installation of the floor slab on the site, a layer of floor steel bars will be anchored into the post cast concrete slab.

I really want to have a look at it more.

This precast residence has a total of 50 floors.

The following indoor wall installation, mechanical and electrical construction, and decoration construction are connected closely and orderly.

The author also saw that each bolt and nut was marked with a diagonal line with a colored pen.

There is no need to worry about the insulation falling off of exterior walls, and it is also easy to update after decades of use.

This project is a 50 story precast super high-rise residential building, which is a column seismic node.

▲ The drainage riser is wrapped with sound insulation cotton ▲ This is the construction model of the floor slab.

▲ For the installation of precast columns, the embedded parts for on-site installation and support have been reserved in the factory in advance.

See, eight screw holes of each embedded part are exactly the same.

Isn’t it amazing? ▲ The node of the precast beam column component is made of on-site post cast concrete ▲ We just walked upstairs by the construction elevator and just saw that the precast beam on the ground car has been lifted up.

▲ Precast members transported to the construction site ▲ The upper row of steel bars of the beam are bound together with the precast members in the factory.

▲ The formal staircase is cast steel structure, and the construction and installation are two floors faster than the floor structure, so that the construction personnel can pass up and down easily, which saves the temporary passage cost and is very safe.

▲ The corridor wall concrete sill is embedded with installation holes and connecting iron pieces ▲ The embedded parts required for the wall under the beam are buried in the factory.

The host also prepared gloves and disposable socks for visitors.

You, as careful as the author, feel and sigh about the lean construction in Japan.

The two-hour visit soon ended.

Presumably, the effect must be very good.

Can you imagine why? ▲ The thermal insulation is made indoors by spraying foam adhesive, which is much easier to construct than the common practice of pasting insulation boards on exterior walls in the north of China.

Plate Anchor

When we visited, it had been installed and constructed to the 40th floor.

The external wall tiles are directly pasted on the precast concrete components.

The interior walls, floor tiles and bathroom decoration have been completed in the factory ▲ The fixing method of the ground pipeline is made by using galvanized shaped supports, The transition block is carefully set at the place where the hose meets the return beam to prevent the deformation caused by gravity from affecting the smoothness in future long-term use.

It must be completed soon after the main mechanism is hoisted and capped.

Colorful lines distinguish different functions ▲ The toilet is also an integrated industrial product.

▲ The external wall tiles have been completed in the factory along with the precast components, which is different from the common practice of external wall thermal insulation in China.

Source: As a rare opportunity for China Resources Land Construction Division, the author visited the construction site of a 50 story precast house built by Wuyang, Japan, and had many feelings and sighs.

It can be seen that the sound insulation design is in place.

▲ Japan is an earthquake prone country, and its seismic technology is very advanced.

Japan’s work efficiency is really fast! ▲ A group of five workers cooperate to install the precast beam ▲ The hole for electromechanical threading is reserved on the beam during factory prefabrication ▲ The embedded parts connected with the tower crane are also embedded in the prefabrication factory.

Just arrived at the site meeting room, I saw the safety helmet prepared by the host for the visitors.

Related Posts