█ PC construction process record of Poly Pingliang 18 Neighborhood Residential Project █ component production ▲ component factory material sampling inspection ▲ mold making ▲ positioning ▲ preparation for sanding component pouring ▲ mold removal ▲ component factory storage ▲ stair component █ component transportation ▲ component factory loading and transportation ▲ component mobilization ▲ component storage and hoisting ▲ component storage after mobilization ▲ component inspection before unloading ▲ component truck arriving at the site waiting for unloading ▲ component type ▲ Stair components ▲ balcony components ▲ on-site storage of components █ component lifting ▲ stair plate lifting ▲ diagonal bracing of wall panel at the stair ▲ vertical measurement of components ▲ component alignment installation ▲ component lower support ▲ component lower gasket ▲ component diagonal bracing ▲ balanced lifting ▲ electromechanical pipeline connection ▲ curtain wall embedded parts ▲ mechanical check █ component grouting ▲ grouting mechanical pressure gauge inspection ▲ grouting mechanical speed test ▲ on-site plugging mortar ▲ pre-casting and purchasing will plug the grouting ▲ Grouting material mixing ▲ Grouting material placing in the machine ▲ Grouting mouth plugging ▲ Cleaning laitance ▲ Retaining test block ▲ Cleaning equipment ▲ Grouting machine █ Construction requirements ▲ Lifting team ▲ Lifting appliances ▲ Traction rope hanging under the component ▲ Balance hoist ▲ Embedded rivets ▲ Storage tools ▲ Pads of different thickness types ▲ Rubber strip at the lower part of the component ▲ Arrangement of cantilever I-beam ▲ Arrangement of cantilever I-beam embedded parts █ Cast-in-situ part work ▲ Connection of cast-in-situ section reinforcement Sleeve ▲ binding of stirrups in cast-in-place section ▲ jacking support of cast-in-place slab in PC layer ▲ jacking reinforcement under the top slab of PC component carriageway ▲ jacking reinforcement of component yard ▲ reinforcement of support under the stair cushion cap ▲ source of jacking support under the balcony: Tsukulong project management (iD: zhulongxm).

The precast implementation rate of the project is 50%, and the precast components are mainly composed of partial shear walls, balcony boards, equipment platform boards, floating windows, and stairs.

Related Posts