[Deepening design of precast buildings] – deepening the design process, how to improve the efficiency of deepening design and ensure that
The deepening determination of drawings can rarely achieve one-time deepening work in place, and the whole deepening process will have many adjustments, modifications, and optimization.
The content is shared from time to time, and the content is written freely.
What should be included in the details of the assembly-type deepening design? In the process of further deepening the design of precast components, it is common for us to ensure that there is accurate positioning of electromechanical pipeline positions, precast component door and window openings, and other relevant reserved holes.
of the component factory, Then carry out in-depth design (which can be understood as optimization design).
The original precast construction drawings provided by the design unit generally contain information such as the type and size of precast components.
The component party proposes to communicate and adjust the original design scheme in order to facilitate the processing, production, transportation, etc.
For projects with tight construction period, it is necessary to plan and carry out the work in advance to ensure that the production of components must be in advance, It is even guaranteed that one or even two layers of precast component materials can be prepared in advance.
The most important work in this process is the communication between all parties: the design team of the precast component processing plant should strengthen the communication with the project design unit (main design content, etc.), and cooperate with the whole process to complete the creation of the design precast component processing drawing accurately, efficiently and errorless.
Welcome more fellow enthusiasts to pay attention to this official account platform, exchange and discuss more related topics together! Content of this issue: [Detailed design of precast buildings] – deepening the design process, how to improve the efficiency of deepening design and ensure that the components are put into production? First of all, the general assembly | PC deepening design process at each stage (several common stages) is as follows: then, as the construction party, the main stage we will go through in the early stage or process of the project construction is the [component deepening design stage and precast component node optimization stage], so the following content will be shared and communicated with the participants personally on this stage.
The precast component party carries out detailed design according to the original design.
In addition to the above, it is also necessary to give full consideration to one: how to transport and stack the precast components during the production and transportation process (it will involve whether the components need to be split, reserved for convenient transportation, and optimized adjustment of the size of some stacked components); Consideration 2: installation holes (external frame installation holes, tower crane attachment holes, paying-off holes, etc.) involved in the construction of precast components, and embedded reserved holes for component hooks.
What are the general participants? After determining the supplier of the precast component factory, according to the project construction progress and other requirements, we must start to carry out the deepening design of the whole component.
Source: welcome to pay attention to, like, collect and forward personal original works.
.
It is very important to ensure that the assembly type deepening design is accurate and in place, and that the production of components in the production line meets the deepening work of supplying precast components at the construction site.
The accumulation is limited.
It is purely a record of personal views.
Therefore, the work of deepening design has requirements for the early planning, the strength of the design team, the timely communication of the process, and the review and modification of drawings.
In this process, the deepening of most components is basically carried out around the original design scheme, but it may occur.
In short, the things that need to be reserved should be considered in advance, the deepening design should be in place at one time, and the processing link should be controlled in place, so as to ensure the “no rework and no slowdown” of on-site construction.
All of them play a key role in the smooth entry of drawings into the production line.
Source: Summary of original work Description: The content of the collection of creative design [in-depth design of precast buildings] on WeChat official account is purely a summary of personal experience and work experience of participating in the construction of precast projects.
(The installation and use efficiency of precast components on the site will be greatly affected by the accuracy of the components on the site, and there will be component errors after transportation to the site, which need to be adjusted or processed, which will seriously affect the site construction progress).
In order to ensure the smooth development of this process, it will generally involve the construction party (including the subcontractors of various disciplines involved in the components, especially the electromechanical discipline), the construction party (Party A), the design party, the component manufacturer, etc.