China Precast Magnet

Precast Concrete Accessories

New Industrialization: Our SGB precast system has made new progress in the application of Henan province

Recently, led by Academician Xiao Xuwen of the Chinese Academy of Engineering and developed by the Engineering Research Institute of China Construction Eighth Engineering Division, the “Vertical Distributed Reinforcement Non connected Assembled Integral Shear Wall Structural System” (SGB L Structural System) has been successfully applied in the Zhongyuan AI Technology Valley project in Zhengdong New District and approved for local standard approval in Henan Province.

lifting socket

.

Related Posts