Common Problems in Building Design – Precast Special Projects (3)
According to Article 3.
0.
3 of the Evaluation Standards for Precast Buildings DB11/T 1831-2021, precast buildings should meet the following requirements simultaneously: 1.
The assembly rate should not be less than 50%; The evaluation scores for each part of the main structure, enclosure walls, interior partitions, decoration, and equipment pipelines should not be lower than the minimum score requirements in Table 4.
0.
1 (Precast Building Scoring Table) of this standard; 3.
Adopt full decoration.
.