Simulation method of precast and assembled bridge piers for rapid construction bridges (ABC)

The traditional bridge construction mode, which is characterized by steel reinforcement binding, formwork installation, and cast-in-place concrete operations on the construction site, can no longer fully meet the needs of current social and economic development.

Bridge construction projects should not only ensure the safety, applicability, economic rationality, and aesthetic value of the structure, but also incorporate the concept of green and environmentally friendly construction, as well as the durability and sustainability of the bridge throughout its entire lifecycle, into important considerations.