The first on the entire line! China Railway Eighth Bureau successfully capped the fully precast and assembled station of Shenzhen Metro Line
On January 19th, the main structure of Guihua Station in Phase I of Shenzhen Metro Line 22, constructed by China Railway Eighth Bureau, was successfully topped out.
As the first fully precast and assembled station on the entire line, the topping out of Guihua Station marks an important breakthrough in the construction of fully precast and assembled technology for Shenzhen Metro Line 22, laying a solid foundation for the subsequent project promotion.
.