Construction technology of precast integrated wall and floor decoration
The total construction area of this project is 63 337.
98 square meters.
Buildings 1-10 are residential buildings, Building 11 is a power distribution room, Building 12 is a property supporting building, and it also includes one underground garage.
The garage has 2 underground floors and the main building has 3 underground floors.
The standard floor height is 3.
1 meters, and the delivery standard is fine decoration delivery.
The kitchen area of each main building in this project adopts precast dry wall and floor construction.
.