Member Style | China Construction Fourth Engineering Bureau: Fully PC precast structural system, with a prefabrication rate of over 85%

The project is located in Nanhai District, Foshan City, with a total construction area of approximately 2649 square meters.

Three buildings, namely the power distribution equipment building, pump room, and alarm room, will be constructed within the station.

Elephant Foot Ferrule

It is a modern indoor GIS substation, covering civil engineering, electrical equipment installation, and system debugging.

After the completion of the project, it will effectively enhance the reliability of regional power supply and the modernization level of the power grid.

.