In the traditional “wet” decoration process, each decoration site can be called a small manual workshop, and the quality of finished products depends on the skills of construction workers in each process such as water, electricity, wood, tile and oil.

In addition, the domestic decoration industry has not had a clear system framework and standards for a long time, resulting in upstream factories and brands acting independently and having their own standards, which is not systematic and self consistent.

Over the past three years, hundreds of assembly and decoration enterprises have entered the financing market one after another.

This also leads most decoration enterprises to be in the dilemma of “large industry, small enterprise” and can not get out of the vicious circle of “rapid expansion and rapid death”.

It makes the decoration a completely industrialized way and controllable for quality and safety.” Say to pet.

Then, assembly decoration is “building blocks”.

On the assembly decoration, Xiang Chong summarized three characteristics: the first characteristic is fast.

The commercial spotlight once again falls on the decoration industry.

The policy also stipulates that precast decoration can be calculated into the building assembly rate.

are used to adjust the keel at the base layer and install precast decorative panels on the surface layer in the process of precast decoration.

In short, assembly decoration is to put many things that need to work on site back to the factory and complete them by machines; A large number of things that need to be completed by labor and technology are realized through standardization and industrialization.

It is understood that 630 million square meters of new precast buildings will be started in 2020, an increase of 50% over 2019, accounting for about 20.5% of the new construction area; In 2020, the area of assembly decoration increased by 58.7% compared with 2019.

In contrast, the “dry operation” refers to a new operation method in which anchor bolts, supports, structural adhesives, etc.

From the perspective of the project operation process, the precast decoration puts the design scheme and construction in front, which can be designed and constructed synchronously with the architectural scheme.

The long-time and fragmented construction links and upstream factories, long processes and the effect of finished products with wrong goods, whether it is the traditional construction team mode or the concept of “Internet home decoration” prevalent in previous years, have failed to change the contradiction between supply and demand of “low customer satisfaction”.

Xiang Chong said in the interview that in the past, the upstream supply chains of the traditional decoration industry were independent and unsystematic.

install a house like a car.

These cumbersome and complex processes have a general name: wet operation.

Industrial Internet is the first media.

Ferrule Insert

In 2017, the Ministry of housing and urban rural development issued the technical standard for precast concrete buildings and the technical standard for precast steel structure buildings, which clearly defined the precast decoration: the precast decoration refers to a decoration method that uses the dry construction method to assemble and install the interior parts produced by the factory on site.

If we say that the traditional decoration work is “pinching the rubber paste”, the finished products will be good or not has the final say.

“With a total area of about 600 ㎡, it can be completed successfully in 7 days with only 2 workers.” Second, low cost, easy maintenance, and more environmentally friendly..

“It follows a basic standard requirements, so that the parts produced by different factories finally fall on one system and form a set of system.

Author Lei Yu editor Zhang Rui source Yibang industry home decoration industry will be “subverted” again? Recently, the “new species” of home decoration has been favored by capital.

From the perspective of construction, the production and on-site installation of cast decoration can also be carried out simultaneously.

According to the action plan for precast buildings in the 13th five year plan issued by the Ministry of housing and urban rural development, by 2020, the proportion of precast buildings in new buildings will reach more than 15%.

Behind the popularity of capital, the biggest driving force comes from policy support.

Make building a house as simple and direct as building a car.

What is “dry construction method”? Taking the most representative wall brushing process in the decoration process as an example, in the traditional decoration process, the wall work can only be completed through seven or eight processes such as gypsum putty leveling, mortar leveling and mortar bonding.

Since dry construction will not produce secondary processing, the construction cycle and cost have also been greatly reduced compared with the past.

This directly brings new development opportunities for precast decoration.

Zhou Yugang cited an example: in the Shanghai amanisalon reconstruction project, the shopping mall operated normally while the on-site rapid assembly was achieved.

According to the statistics of Yibang power, in the past month, at least five related enterprises have completed financing: second image, house decoration technology, Zhongyu assembly, deformed building blocks and yingshemeiju.

With favorable policy advantages and attentive capital market, Xiang Chong, the founder of pinzhai decoration technology, described the assembly decoration industry in his eyes to Yibang power in the words of “favorable weather, favorable place and harmonious people”.

I.

Compared with the wet operation which pays more attention to manpower and technology, its core lies in standardization and prefabrication.

Then, assembly decoration is “building blocks”.

In this context, the assembly decoration of “heavy factory, light site” makes the factory an important link of quality control; Mechanized production avoids the direct impact of workers’ technology on project quality.

Industry has the final say that the traditional decoration work is “pinching the rubber paste”, and the finished products are good or not.

According to the data of Beijing affordable housing center, a 50 square meter public rental house adopts assembly decoration, and the construction period is only 6 days, while the traditional decoration construction period is 30 days, with obvious speed-up.

From the product point of view, the assembly decoration divides the traditional eight decoration modules into multiple parts, which are independent of each other, produced synchronously and combined harmoniously.

“The assembly type belongs to factory assembly line production, which is not limited by weather, place, time and worker level.” Zhou Yugang said.

“This is an industry from slow to fast, and it is also an inevitable trend and development direction.” Zhou Yugang, general manager of Zhongyu assembly Beijing Branch, summarized the unique advantages of precast decoration in his eyes with the words “anytime, anywhere, installation at will”.