China Precast Magnet

Precast Concrete Accessories

Application of BIM Technology in assembly project

Data collection since the beginning of the project, various versions of drawings are collected through the owner and design unit for real-time updating of drawing model to ensure the accuracy of data.

Don’t forget to give a praise before you go!.

After integrating the full discipline model, the problem report shall check the collision between disciplines, find the problems of design drawings, feed back and solve the corresponding problems, and meet the consistency of drawings and models.

application of design BIM consulting Bim in the project design stage (timeline) 3.1.

This project is the BIM application project of XX precast residence, with a land area of 102916.30 m2, and the precast residence accounts for 100%, mainly including multiple residential buildings.

Building model, structural model, electromechanical model, single full discipline model 3.3.

Model creation and integration, establish full professional models according to the funded design drawings, and carry out the assembly and integration of various professional models.

Edition on May 11: the first edition of preliminary design drawings; edition on June 15: the first edition of construction drawings; edition on June 25: construction drawings of foreign houses and stacked PC; And hardbound drawings, July 11 Edition: final construction drawings of foreign houses and stacked PC, August 23 Edition: construction drawings of guarantee and self-supporting PC, September 10 Edition: final construction drawings of XX town project, 3.2.

general management flow chart of construction drawing design of the project III.

Solid Lifting Socket

1、 Management and control standards of each stage II.

Today, Xiaobian will show you the application of BIM Technology in precast housing projects from these aspects.

One of the whole process applications of BIM Technology in the precast project.

The application scope of BIM Technology at this stage includes management and control standards, management processes, design BIM consulting, etc.

Inspection report (I) inspection report (II) 3.4 problem three-dimensional effect display verification before model verification (I) after model verification (I) before model verification (II) after model verification (II) ok, that’s all for today’s sharing.

The content of the next issue is more wonderful.

Management process general management flow chart of preliminary design of the project III.

Related Posts