China Precast Magnet

Precast Concrete Accessories

Assembly decoration is the direction of green hardcover in the future

The construction is rapid, and the on-site assembly has no wet operation, waste and pollution.

The wallboard is assembled on site to eliminate cement mortar and protect the environment; Veneer can also be made of thin stone, ceramic tile hanging board or other materials.

How to do a good job of precast decoration? This paper makes a summary from the perspective of design, production, construction and management.

However, the project design, construction process and completion effect are uneven and different, especially the final completion effect is not satisfactory, which makes people doubt the development of precast decoration.

2.

Interior design shall participate in the plane design and house type design of single building in the architectural scheme design, integrate electromechanical conditions, assist in the accurate positioning of electromechanical end points, coordinate the layout of pipelines with electromechanical, adhere to the concept of separating the main structure of the building from the interior system and equipment pipelines, and verify that there is no conflict between buildings, equipment, pipelines and decoration.

Integrated decoration, fine decoration, water supply and drainage, electrical, integrated kitchen and integrated toilet.

For precast decoration, the base course and surface course of roof, wallboard and ground shall be precast in the factory, and the special assembly parts required shall be precast and transported to the construction site for dry construction method assembly; All woodwork completely abandons the process of painting on site.

Wardrobe, door, wood finish, stone, etc.

Compared with traditional decoration, the advantages of precast decoration are prominent: only industrial workers who can strictly implement the construction process are needed on site, which greatly improves the efficiency and reduces the on-site construction cycle; Integrated production of parts system, high degree of industrialization, more stable quality and more economical raw materials; On site assembly, no noise and dust pollution, green environmental protection; The raw materials are based on metal and cement, which can be recycled, more energy-saving and more in line with the national sustainable development strategy.

3 construction assembly through factory management, standardize assembly actions and procedures, and industrial workers carry out on-site dry construction.

Photo source: pixabay copyright free photo # overall kitchen system: the kitchen ceiling and wall are assembled without cement mortar, which is green and environment-friendly; Veneer can also be made of thin stone and ceramic tile hanging board.

Ground system: adjustable foundation support can customize the ground, and plumbing pipes can be arranged in the overhead floor.

It rose after World War II, especially in Japan in the 20th century, and gradually formed a complete assembly system.

China’s housing construction has entered the era of assembly, which drives the development of precast decoration in full swing and blooms everywhere.

Interior design shall be coordinated and unified with architecture, structure and electromechanical integration design.

Coil Insert

Guided reading No.49 precast buildings reduce energy consumption and have broad development prospects.

The stairs shall be manufactured in factory and assembled in a reasonable time according to the construction process nodes.

4.

Photo source: pixabay copyright free picture # overall bathroom system: the bathroom adopts an overall waterproof chassis, and the special odor proof floor drain and sewage casing are closely connected with the waterproof chassis, which completely eliminates the hidden danger of leakage in the bathroom.

The cabinet is finely designed, the upturned cabinet door is convenient to use, the bottom space can be fully utilized, the wall socket uses the keel thickness, hidden treatment, and the space is cleaner.

can be simulated by BIM system and placed with orders, which can achieve zero cutting on site and only need to complete the assembly; The construction site is truly pollution-free, garbage free and green.

Wall hanging board system: factory production of partition wall foundation system; The surface layer can be green and environment-friendly integrated decorative panel, or factory wood veneer or stone and other parts with higher quality.

are processed in the factory.

Ceiling lamp slot system: ceiling lamp slot components are processed, disassembled and assembled on site.

To do a good job in assembly decoration, we must achieve five in one: design standardization, production industrialization, construction assembly, decoration integration and management informatization.

The production is industrialized, the products are integrated into parts, and the parts are integrated into models, specifications and design standards.

Stone and ceramic tiles are no longer cut on site.

Design standardization.

Hanging parts are reserved for cabinets and walls, and all dry operations are carried out in the overall kitchen, with high construction efficiency.

1.

Only by adhering to people-oriented and practicing refinement and perfection, can we continue to provide residents with green hardcover products in line with the spirit of the times and better meet people’s needs for a better life…

The parts shall be numbered uniformly in the interior design stage and implemented according to the number in the production and installation stage.

All disciplines cooperate closely and cooperate in design.

The research on assembly type has far-reaching significance for the hardcover of residence.

(contributed by the research center of the design company) precast decoration, also known as industrialized decoration, gradually formed with the development of industrialization.

5 management informatization no matter design or production, transportation, storage and construction, all shall achieve informatization management, make rational use of materials and reasonably arrange the construction period.

The precast decoration increases the depth of drawings, pays attention to the integrity of parts, and the design is integrated, modular and parameterized.

It is convenient for the factory to design and stack modular products in large scale.

Components can be managed by bar code, with codes corresponding to drawings and assembled on site; Water pipes, electric pipes, etc.

Related Posts