China Precast Magnet

Precast Concrete Accessories

[Fuxin] Notice on Further Strengthening the Work Related to Precast Buildings and Green Buildings in Fuxin

All new civil buildings in our city (except rural self built residential buildings) are implemented in accordance with the requirements of the Green Building Evaluation Standard GB/T50,378-2019.

precast buildings (1) All construction projects and public welfare buildings, public building projects, and industrial building projects invested by the government and state-owned enterprises are designed and constructed as precast buildings.

13 of the Ministry of Housing and Urban Rural Development), such as precast buildings, building energy efficiency and green buildings.

The administrative departments in charge of construction at all levels should constantly strengthen process supervision, and thoroughly straighten out the whole process supervision system from planning and project approval, architectural design, construction drawing design document review, construction supervision, construction test detection to completion acceptance.

2、 In terms of green buildings, the relevant requirements of Liaoning Provincial Green Building Regulations, Notice on Further Promoting and Implementing Liaoning Provincial Green Building Regulations (FZJF [2019] No.

(7) The property enterprises shall strengthen the operation management in the later period and formulate corresponding special management systems for energy conservation, water conservation, material conservation and greening.

(5) The construction unit shall formulate a special construction plan according to the reviewed and qualified construction drawing design documents, combined with the characteristics of precast buildings and green building standards, and organize the implementation.

93), Notice on further strengthening the work of precast buildings and green buildings in our city is as follows: 1.

are carefully implemented.

80), etc.

For relevant standards and interpretations of precast buildings, please refer to the Evaluation Standards for Fabricated Buildings (GB/T51129-2017), and implement the Detailed Rules for Calculation of Assemblage Rate of Fabricated Buildings in Liaoning Province, Version 2022 (Trial) (LZJJG [2020] No.

71), the Implementation Opinions of the General Office of the People’s Government of Liaoning Province on Vigorously Developing Fabricated Buildings (LZBF [2019] No.

For the precast and green building projects in our city, special contents are added in the links of construction drawing review, construction permit, quality and safety supervision, completion acceptance and filing.

33, Luoyu Road, Hongshan District, Wuhan City Working Hours: 8:30-17:30 Monday to Friday Tel: 027-87636130 15623858793.

2).

(2) The construction unit is the general responsible unit for precast buildings and green building projects, and shall be fully responsible for the implementation of precast buildings and green building indicators, implementation process and project quality and safety in accordance with relevant national, provincial and municipal regulations.

3、 Main responsibilities of all parties (I) Construction administrative departments at all levels should strengthen the supervision of precast buildings and green building projects.

Bubble Panel Pad

(6) The supervision unit shall prepare detailed rules for the supervision of precast buildings and green buildings according to the reviewed and qualified construction drawing design documents, precast buildings and green building standards, combined with the construction scheme, and implement supervision.

(2) For the construction projects invested by social funds, the precast design and construction shall be carried out according to more than 27% (including 27%) of the total construction area.

(4) The construction drawing review organization shall strictly control the technical review, and shall not issue the construction drawing review certificate for precast buildings that fail to meet the requirements of the assembly rate and relevant mandatory standards, and those that fail to meet the green building standards or fail to implement the energy-saving review opinions.

1365 words in the full text: all county and district housing construction bureaus, all development and construction, design, construction and supervision enterprises, urban construction groups, and construction drawing review agencies: in order to thoroughly implement the spirit of relevant documents such as the Guiding Opinions of the General Office of the State Council on Vigorously Developing Fabricated Buildings (GBF [2016] No.

Appendix: Notice of Fuxin Housing and Urban Rural Development Bureau on Further Strengthening the Work of Fuxin Precast Buildings and Green Buildings Docx Fuxin Housing and Urban Rural Development Bureau [Training Notice] on October 29, 2022, Notice on Organizing Special Skills Training and Examination for 2022 Phase V Intelligent Construction Project ▲ Exhibition of Excellent Green Building&Sponge City Project Room 2004, Central Creative Building, No.

If it is really necessary to modify, the construction unit shall submit the modified construction drawings to the original review agency for approval before implementation, if it involves the contents specified in Article 11 of the Administrative Measures for Review of Construction Drawing Design Documents of Housing and Municipal Infrastructure Projects (Order No.

(3) The design unit shall design in accordance with the standards for precast buildings and green buildings, define relevant design sections, and meet the requirements for corresponding design depth.

For those that do not comply with the regulations and requirements, the development and construction, design, supervision and other units shall be recorded as bad behavior records, and those that do not comply with the regulations and requirements shall be recorded in the integrity system archives.

For those that do not comply with the regulations and requirements, relevant engineering construction procedures shall not be handled.

No unit or individual is allowed to modify the approved construction drawings without authorization.

Related Posts