Highlights | RBS “Fabricated Steel Structure+Welding Robot Technology” on CCTV Channel “Building in a Big Country”
The “super high-rise steel structure+on-site welding machine man solution” jointly declared by RBS and BOT was successfully included in the list.
As a cross disciplinary comprehensive emerging technology, “cast steel structures+welding robot technology”, RBS, in response to the encouragement of national policies, not only solves the structural problems of industry development, but also adheres to the integrated development of cast buildings and green buildings.
After nearly ten years of unremitting research, SPI system has formed a series of key technologies and patents closely related to its connotation: · SPI system comprehensive technology · steel structure rapid installation speed increasing technology · steel structure on-site automatic welding robot technology · industrial integration technology of fireproof materials · reverse practice and SPI system combination method and other current domestic super high-rise fields.
The Zhuhai Hengqin Headquarters Building Project of RBS Design Consultants is located in the south of the Shizimen CBD in Hengqin New District, Zhuhai.
The research on SPI system began in 2013.
The early experimental research on the outsourced steel plate shear wall, based on the Guangzhou East Tower project, was successful in the laboratory of Tsinghua University, and was highly recognized by experts such as academicians of the CAE Member and national design masters.
On site welding often becomes a key factor in construction.
The pure assembly hoisting construction is fast and efficient.
The architectural modeling inspiration comes from the extraordinary momentum and elegant posture of Tenglong.
Welding is the highest technology content in the building construction process, especially the on-site welding of super high-rise steel structures.
There is no climbing formwork system.
This project is the first fully cast steel structure super high-rise building in China.
On November 3, the second season of Building a Great Power on CCTV Finance Channel (CCTV2) was launched.
The framework of Gemini is installed on site, and the cast super high-rise steel structure is constructed at night.
The “double towers and double dragons” embrace the “dragon ball”, and the modeling with strong sense of lines is quite uplifting; The facade design of the tower body takes the meaning of “dragon scale” to form a rich and gradual curtain wall texture; The twin towers are shaped in one go, reflecting the rich Chinese culture.
The hoisting of typical steel plate shear wall components is different from the traditional hybrid structure construction.
The full name of the construction site panorama RBS-SPI in the effect drawing of Hengqin Headquarters Building is Superhigh rise fully assembled steel structure industrialization system design and construction (SPI for short).
Promoting the technological progress of robot welding is a powerful means to solve the pain points of the industry.
The fourth episode of the video, “Casting and Smelting Glory”, shows nine projects including Zhuhai Hengqin Headquarters Building, in which the detailed process of applying “cast steel structure+welding robot technology” to Zhuhai Hengqin Headquarters Building is introduced.
SPI is a real building industrialization system through the integration of design and construction.
In August this year, the Department of Housing and Urban Rural Development of Guangdong Province released the first batch of typical examples of innovative services for new technologies and new products of intelligent construction in Guangdong Province in 2022.
The labor and management costs of manual welding remain high, the process and quality control of manual welding are difficult, the enterprise operation bears high risks, and the industry faces problems such as insufficient youth.
Part of the material comes from CCTV Finance’s Building a Great Power.
Due to large investment scale, high technical requirements The cooperation between disciplines is required to be high, and the design and construction level are required to be high.
The total land area of the project is 80046.95 square meters, and the total commercial building area is 80000 square meters.