Important notice Fujian province organizes the application for the third batch of precast construction production bases
Pay attention to us to get more wonderful content.
Tel.: 0591-87677113, address: room 817, Kaijie building, No.
189, Hudong Road, Gulou District, Fuzhou City, e-mail: 7539615@qq.com 。 03 other requirements: the competent departments of housing and urban rural development in cities divided into districts shall organize the first two batches of recognized production bases (see Annex 3 for details) to prepare a base self-examination report (see Annex 4 for key points of preparation), and evaluate the construction of the recognized production bases in the region to form an evaluation report, including the overall situation of the production bases in the region, the daily supervision of the production bases and the completion of the construction tasks of the production bases.
2、 The work basis includes the industrial capacity and actual production capacity of each business segment of precast building, the R & D and innovation, promotion and application of core technology and supporting product technology, technology integration and professional collaborative development, etc.
Including enterprise scale, business segment, organization, etc.
(2) The competent department of housing and urban rural development of cities divided into districts shall organize the preliminary review, and send the qualified application materials (in duplicate) to the Department industry office before June 20, with one electronic document sent to the mailbox.
3、 The work plan includes development objectives, key work tasks, construction tasks, work plans (including phased assessment contents), etc.
It has independent legal personality and strong industrial capacity of precast buildings, and plays an exemplary and leading role in the development of regional precast buildings.
Annex 01 application form for precast building production base 02 application form for precast building production base I.
(2) The accumulative total of precast construction projects participated in by design, construction, parts and components production enterprises or product applications shall not be less than 300000 square meters, and the science and technology R & D enterprises shall preside over at least 5 provincial and ministerial level or above precast construction related scientific research projects.
4、 Comments and suggestions..
(3) It has advanced and mature precast building technology system.
(5) It has a perfect modern enterprise management system and product quality control system, has a good market reputation, and has no major or above production safety accidents in recent three years.
4、 Safeguard measures 03 list of recognized precast building production bases 04 key points for preparation of self inspection report of production base I.
overview, including enterprise legal person, capital contribution, business segment composition and revenue (recent 5 years), main performance, scientific research team, enterprise development profile, etc.
02 application procedure (I) the applicant shall fill in the application form for precast building production base (Annex 1) and the application form for precast building production base (Annex 2), and submit it to the competent department of housing and urban rural development of the cities divided into districts together with the copies of the business license, qualification certificate and other relevant materials (in triplicate).
The notice of relevant matters is as follows: 01 application conditions (I) the applicant is an enterprise engaged in the design, construction, production of parts and components and scientific and technological research and development of precast buildings.
3、 Existing problems and next work plan.
The design enterprises shall apply the building information model (BIM) technology to the forward design of precast buildings.
overview of production base.
Summarize the completion of planned tasks, work experience and results according to the application conditions and the development objectives, construction tasks, work plans and other requirements proposed in the base construction plan.
2、 Work progress of the production base.
187) issued by the general office of the Ministry of housing and urban rural development, Fujian Provincial Department of housing and urban rural development has organized the application for the third batch of precast construction production bases.
The construction enterprises shall have mature process methods and corresponding construction technology.
The parts and components production enterprises shall have intelligent automatic production capacity and parts and components database.
(4) It has a high level of standardization and has specific practice in promoting standardized design and production.
The assessment report together with the self inspection report of the base and the third batch of base application materials shall be provided at the same time.
According to the requirements of the notice on organizing the application for the third batch of precast construction production bases (jbbh [2022] No.