[investment attraction] 46000 tons / year precast building materials project

Only the annual housing construction market in our city is about 4billion yuan, if it reaches 30%, it will be about 1.2 billion yuan.

At present, Xinjiang precast buildings are in the initial stage,.

Preliminary preparations: Zhejiang Baoye group and East China Architectural Design and Research Institute Co., Ltd.

The project plans to purchase a total of 72 sets of equipment, mainly including 24.2149 million yuan for the purchase of traveling cranes, loaders, cutting machines, mixers, steel bending machines, steam curing equipment, molds, straightening machines and other equipment.

Liu Tel.: 13585591103 source: investment in Karamay..

Industry of the project: the development of precast buildings is a major change in the construction mode, which is conducive to saving resources and energy, reducing construction pollution, and improving labor production efficiency and quality safety level.

The action plan for precast buildings in the 13th five year plan points out that by 2020, the proportion of precast buildings in new buildings will reach more than 15%; Karamay is within 300 kilometers from Altay, Tacheng, Shihezi and Kuitun, just within the radiation distance of precast buildings; Karamay has a good industrial foundation; Suitable for the production and promotion of precast buildings; The supply of raw materials is sufficient and the cost is equivalent to that of surrounding areas.

Karamay can fully guarantee the supply of raw and auxiliary materials required for the project.

Advantage analysis: the precast buildings around Karamay are generally in the initial stage.

have communicated with Karamay District, learned about the city’s construction market, and investigated the site of the supporting works of the precast building base.

Main contents of the project: the estimated fixed asset investment is 77.5329 million yuan, including the construction of main works, warehousing works, power supply and distribution works, water supply and drainage works, service works, fire protection and environmental protection works, project general drawing works, greening works, etc.

Foot Mounted Anchor

A official account project of Shanghai Liaison Office • investment and trade center to cheer for the dream Name: the project with an annual output of 46000 tons of precast building materials estimated total investment: 92million yuan project construction location: Southwest Industrial Park, Karamay District planned construction scale: the project covers an area of 25912.95 square meters (equivalent to about 38.85 mu), and the planned total construction area of the project is 32391.19 square meters, including 23142.24 square meters of the planned main project, An annual output of 46000 tons of precast building materials.

Project cooperation mode: sole proprietorship and cooperation.

Product resources and raw material supply: the main raw materials and auxiliary materials required for the project include: cement, sand, steel, concrete, etc.

Prepared by: Urumqi investment and Trade Center.

Market demand forecast: according to the plan, the proportion of precast buildings in China will reach 30% in 2025.

Contact: Ms.

Economic Benefit Forecast: after the project is completed, it will generate an annual operating income of 140million yuan, a net profit of 26million yuan, a return on investment of 28.2%, a payback period of 5.01 years, and provide 160 jobs.

In the past decade, with the rapid development of economy, the rise of labor costs, the improvement of precast component processing accuracy and quality, the construction technology and management level of precast buildings, and the promotion of national policy factors, precast buildings have been warming up again and showing a trend of rapid development.

Considering the needs of surrounding areas, the market prospect is broader.