China Precast Magnet

Precast Concrete Accessories

Li Shizhong: ten years of 100 people leading the development of precast buildings (30)

As the person in charge of the subject, Li Shizhong has formed 12 patents, including 3 invention patents, 1 national construction method and 6 provincial and municipal construction methods.

Short Waved Anchor

Participated in the compilation of 6 national and industrial standards and local standards, including industrial standard evaluation standard for industrialized buildings (GB / t51129-2015), technical code for safety of bamboo scaffolds in building construction (jgj254-2011), Shenzhen standard technical specification for precast reinforced concrete exterior walls (sjg24-2012), Guangdong Technical Specification for precast concrete building structures (dbj15-107-2016) The local standard of Shenzhen, operation specification for fabrication and installation of precast concrete components (Draft for comments), and the standard of Shenzhen Association, star rating standard for precast concrete component manufacturers, sztt / bias0001-2017.

For the original text, see the list of “100 people in ten years” in the third issue of “architecture” on page 31, issue 4, 2022 (all ranking in no order).

He won the title of “advanced individual in creating Luban Award project” in 2012, the title of “excellent chief engineer of national construction enterprises” in 2014, the title of local leading talent in Shenzhen in 2015, the national model worker in housing and urban rural construction system in 2017, and the first batch of positive and senior engineer certificates of precast buildings in China in 2021.

The leading precast project, long Yueju phase III, won the Zhan Tianyou award of China Civil Engineering, and Jinyu Lanfeng won the national precast building demonstration project award.

Important achievements Li Shizhong has long been engaged in the technical R & D and design of precast buildings.

His achievements include dozens of national and provincial construction methods, 10 standards and 15 patents, including 3 invention patents, 6 papers and professional technical analysis reports, 1 monograph and many speeches at large academic forums.

“Research on comprehensive construction technology of integral building with internal pouring and external hanging assembly” won the first prize of science and technology of civil engineering and architecture in Guangdong Province.

He once served as the executive deputy general manager and chief engineer of Pengcheng construction group, took charge of longyueju phase III, the first precast residential project in Shenzhen, and served as the project manager of Jinyu Lanfeng, a national precast demonstration project.

Layout of Shenzhen Component Factory, practice the process of assembly construction, aluminum film, climbing frame, full interspersed fine decoration, assembly decoration and so on.

The 30th issue | Li Shizhong Li Shizhong, vice president of Shenzhen construction engineering group and President of Design Institute, is responsible for EPC and assembly business.

Li Shizhong sent a message that building industrialization is the only way for the construction industry to realize low-carbon transformation, accelerate the R & D and promotion of advanced technologies in the field of building industrialization, and jointly promote the gradual improvement of technical standards, policies and mechanisms in the field of building industrialization.

US editor: Liu Zhiqi typesetting: Zhang Yi planning: Tang Jian can enter the wechat store by clicking on the picture or scanning the QR code..

Related Posts