China Precast Magnet

Precast Concrete Accessories

“Lutai information” on the misunderstanding of assembled interior decoration

Plate Rebar Anchor

The implementation of new technologies and processes is greatly affected by the investment cost.

Click below“.

The lack of modular design results in serious personalization and differentiation of parts and components, which directly increases the cost of factory production and the waste of manpower for on-site installation.

At present, the development of precast interior decoration is still in its infancy.

The design method and design mode of precast interior decoration will gradually mature, the cost awareness in the design stage will be gradually strengthened, and the precast interior decoration will certainly develop by leaps and bounds after the construction team is polished.

02 application technology system and overall solution there is a lack of standard technology system and overall solution in the construction stage of precast interior decoration.

With the continuous promotion of national policies, the sustainable development of parts industry, the landing and verification of demonstration projects, the principles of standardized design and modular application will be truly and concretely implemented step by step.

The essence of precast interior decoration is to solve the quality problems of traditional decoration in the way of parts industrialization, so as to promote the high-quality development of precast buildings.

The efficiency of large-scale construction will always be affected, and there are many hidden dangers in the project quality.

It is often the component manufacturer or construction party who puts forward the technical scheme and makes it into a model room for Party A’s selection.

It is more likely to ignore the project quality in pursuit of assembly rate, which will have a negative impact on the investor in the short term.

For investors, the current three misunderstandings need to be paid attention to: the standardization degree of parts and components in the first architectural design stage does not pay enough attention to the design of precast interior decoration, and the standardization degree of building use space and parts and components is low, resulting in the high cost of precast decoration.

Related Posts