People’s governments of all districts (development zones) and relevant units: in accordance with the notice on printing and distributing the key points for the development of precast buildings in Wuhan in 2022 (WJC [2022] No.

brief introduction of the construction unit; 2、 Basic information of the project; 3、 Analysis of main contents of demonstration; 4、 Calculation sheet for assembly rate of precast buildings: calculation basis, calculation process and calculation results; 5、 Preliminary analysis of precast construction cost; 6、 Construction period analysis: including design period, procurement period, component production period and construction period; 7、 Project site and construction feasibility analysis: including analysis of transportation route and distance of precast component factory, analysis of project standardization degree and structural design, analysis of site internal transportation and tower crane layout; 8、 Quality and safety assurance measures; 9、 Analysis of economic, social and environmental benefits.

Source: Wuhan Urban Rural Development Bureau click the end of the article“.

1), in order to fully implement the work objectives of precast building demonstration projects in all districts and give full play to the leading role of demonstration projects, they have decided to carry out the application of precast building demonstration projects this year.

3.

If there is no objection after being publicized, they shall be released.

The above items include precast concrete structure, steel structure, wood structure, etc.

The relevant matters are hereby notified as follows: 1.

Thread Swivel Eye

4、 Specific requirements (1) all units shall attach great importance to, carefully organize, determine the contact person and contact information responsible for the application, do a good job in the application, and implement the annual objectives of the precast building demonstration project; (2) The people’s Government of each district (Development Zone) shall organize the construction unit under its jurisdiction to fill in the application form according to the requirements of Annex 1, and prepare the feasibility study report according to the requirements of Annex 2; (3) The demonstration projects that have passed the review of the expert group shall be publicized according to the procedures after being reviewed by the leading group office.

integration of precast building decoration.

4.

adopt EPC and whole process engineering consulting mode; 4.

the demonstration project shall be a project construction unit or general contractor with independent legal personality, and there can only be one application unit for the same demonstration project.

“progress” in the table refers to the following stages: (1) design stage: preliminary design and construction drawing design; (2) Construction preparation stage: construction drawing design review, construction condition preparation, project bidding, etc; (3) Construction implementation stage: civil construction (foundation, main structure, decoration, outdoor greening, etc.), equipment installation, etc; (4) Completion acceptance stage.

3、 The following materials shall be submitted for the application of precast building demonstration projects: (1) Wuhan precast building demonstration project application form (Annex 1); (2) Copy of project approval document or project filing certificate; (3) Copies of the business license and enterprise qualification certificate of the applicant; (4) Feasibility study report of Wuhan precast building demonstration project (Annex 2).

Feasibility study report of Wuhan precast building demonstration project I.

5、 Other matters (1) to give priority to recommending and applying for national and provincial demonstration projects from municipal demonstration projects; (2) The application materials shall be in duplicate and submitted to the leading group office before July 15, 2022.

breakthrough or innovation in key technologies with promotion value; 5.

2、 According to relevant national, provincial and municipal policies, regulations and technical standards, the application conditions are precast construction projects that play an exemplary, leading and leading role in system integration design, application of new generation information technology, intelligent construction, construction technology, organization and management mode, precast buildings above class A, new building structure system, etc.

precast buildings shall meet the national, provincial and municipal evaluation standards for precast buildings and the assembly rate calculation rules.

If the applicant is found to have made a fraud, its application qualification shall be revoked.

2.

(1) The applied demonstration project shall have the project approval document or project filing certificate, and the feasibility study report of Wuhan precast building demonstration project shall be prepared; (2) The assembly rate of the declared demonstration project shall not be less than 50%, which conforms to the basic provisions and calculation requirements in the detailed rules for calculation of assembly rate of precast buildings in Wuhan; (3) Residential projects and public buildings with precast concrete structure or steel structure shall have a single building area of not less than 10000 square meters or a group building area of not less than 30000 square meters; (4) Projects that meet one of the following conditions shall be declared preferentially: 1 The monomer assembly rate shall not be less than 60%; 2.

public welfare public buildings such as hospitals and schools with cast steel structure, and large public buildings such as airports, stations and shopping malls; 3.

The scope of the application project (1) independent affordable housing; (2) Public welfare public buildings invested by the government; (3) Housing development projects; (4) Municipal infrastructure works (subway tunnel enclosure structure, urban road and bridge, comprehensive pipe gallery, etc.).

Contact: Li Xin Tel.: 027-85800759 email: 836172154@qq.com Attachment: 1 Wuhan precast building demonstration project application form 2 Feasibility study report of Wuhan precast building demonstration project Wuhan construction industry modernization promotion leading group office June 7, 2022 Wuhan precast building demonstration project application form description 1 The declaration form shall be filled in small four point imitation song font and printed on A4 paper.