Two or three things about assembly cost learning

Third, in terms of drawing recognition, assembly drawing is an integral part of the drawing.

8.

Civil engineering / installation cost zero basic training camp on February 24 6.

In this way, you can’t understand it, and the cost is impossible to talk about.

At least the basement and foundation are cast-in-situ, while the aboveground part is also cast-in-situ and precast assembly of some components.

Therefore, the cost of a complete precast building must use both civil installation quota and precast quota.

1.

Can you directly learn the cost of precast engineering without civil engineering cost? A: No.

Municipal roads need to be consulted in advance 7 Enterprise customization can be booked in advance.

For a complete project, it is impossible to separate the assembly drawing from the whole set of drawings and read the drawing alone.

Evening broadcast of cast construction project cost on February 14 2.

Civil engineering / installation cost weekend training camp on February 19 4.

Secondly, the assembly type is a construction method, and its essence is the civil engineering cost.

Therefore, the complete project cost is composed of traditional cast-in-situ concrete components + precast assembly components + masonry + doors and windows + decoration.

First of all, a complete precast building cannot be completely assembled.

3.

2.

It can be understood that Henan 19 assembly type quota is a chapter of Henan 16 civil engineering quota.

Recent opening plan of Henan brick and tile Engineering Management Co., Ltd.

Civil engineering / installation cost evening training camp on February 21 5.

Online course of system cost: www.gjspsc.com Com Tel: 0371-63215179..