Notice of Taizhou City, Zhejiang Province on Printing and Distributing the Administrative Measures for the Evaluation of Precast Buildings |

If necessary, the evaluation shall be reorganized.

Rubber Recess Former

22) and other documents, To improve the design and construction level of precast buildings in our city and promote the high-quality development of precast buildings, we hereby print and distribute the “Taizhou Precast Building Evaluation Management Measures” to you, please earnestly implement it.

The construction unit shall submit the relevant materials for the evaluation of precast buildings to the office of the special committee for registration and filing for future reference.

Article 6 The precast buildings shall be organized and implemented according to the following evaluation procedures and requirements: (1) pre-evaluation at the design stage.

22) In order to improve the design and construction level of precast buildings in our city and promote the high-quality development of precast buildings, these measures are formulated in accordance with the Evaluation Standard for Precast Buildings (GB/T51129-2017) and the Evaluation Standard for Precast Buildings (DB33/T1165-2019) of Zhejiang Province.

Chapter IV Supervision and Management Article 7 The construction unit shall implement its responsibilities, urge and implement the project participants to carry out construction in strict accordance with the design documents of precast building construction drawings that have passed the drawing review, keep the relevant data and images of the construction process, and ensure that the evaluation items and written commitments are implemented in place.

The Taizhou Precast Building Evaluation Form (Pre-evaluation at the design stage) shall be submitted to the local construction department where the project is located and uploaded to the construction industrialization management system.

The precast building referred to in these Measures refers to the building assembled by precast parts on the construction site.

The Taizhou Precast Building Evaluation Form (Evaluation at Completion Stage) (see Annex 2 for details) shall be submitted to the local construction authority where the project is located.

3.

Article 3 The evaluation of precast buildings shall follow the principles of science, openness, fairness and impartiality.

47) and the “Implementation Opinions of the Office of the People’s Government of Taizhou City on Promoting the Development of Green Building and Building Industrialization” (TZBF [2020] No.

For projects involving policy incentives, experts shall be organized to review, and the review procedure is the same as that of the design stage.

When the precast technical scheme changes greatly due to the design change, the construction unit shall recalculate the assembly rate and submit the assembly rate calculation sheet according to the changed design drawings (which shall be reviewed by the original drawing review unit), and the original review expert shall review and confirm it.

4.

The expert review team will conduct pre-evaluation of the applied project at the design stage of precast buildings and issue an evaluation opinion.

Article 2 These measures are applicable to the evaluation and management of precast buildings under the supervision of the competent departments of housing and urban and rural construction at the municipal and county levels in Taizhou.

47) and the Implementation Opinions of the Taizhou Municipal People’s Government Office on Promoting the Development of Green Buildings and Building Industrialization (TZF [2020] No.

For precast building projects applying for building area award, a special section of area award shall be provided during the pre-evaluation at the design stage.

Chapter III Evaluation Procedures and Requirements Article 5 The evaluation of precast buildings is divided into two stages, the first stage is the pre-evaluation of the design stage, and the second stage is the evaluation of the completion stage.

Chapter II Evaluation Scope Article 4 Evaluation scope of precast buildings: new government-invested buildings newly established within the administrative area of Taizhou City, new projects on newly transferred or allocated land within the central urban area designated in the special plan for green buildings in Jiaojiang District, Huangyan District, Luqiao District and Taizhou Bay New Area, New projects on newly transferred or allocated land within the central urban area designated by other counties (cities) in the special green building plan, as well as engineering projects that are explicitly required to implement precast buildings in documents such as the planning conditions of construction land outside the above enclosed area, the announcement of the auction or listing of the right to use, and the land transfer contract (land decision and allocation decision).

The construction drawing design documents shall calculate the precast part of the wall not included in the floor area ratio by building, and prepare the list of precast exterior wall components.

The assembly rate is subject to the evaluation at the completion stage.

When applying for the review of construction drawings, the construction unit shall submit not only the design documents of construction drawings, but also the Evaluation Form of Taizhou Precast Buildings (Pre-evaluation at the design stage), the evaluation opinions of precast buildings and the technical scheme of precast buildings.

5.

The Housing and Urban-Rural Development Bureau of each county (city, district), the Taizhou Bay New Area Construction Bureau, and the units directly under the bureau: in order to implement the spirit of the “Several Opinions of the General Office of the People’s Government of Zhejiang Province on Further Supporting the Building Industry to Be Better and Stronger” (ZBF [2022] No.

For projects that do not meet the evaluation requirements for precast buildings, the application materials shall be returned, and the evaluation shall be reapplied after meeting the requirements.

Taizhou Municipal Bureau of Housing and Urban-Rural Development, on January 17, 2023, the first article of the first general rule of the first chapter of Taizhou Municipal Administrative Measures for the Evaluation of Assembled Buildings is to implement the Several Opinions of the General Office of the People’s Government of Zhejiang Province on Further Supporting the Building Industry to Be Better and Stronger (ZBF [2022] No.

(2) Evaluation at completion stage.

1.

At the completion acceptance stage of the project, the construction unit shall organize the participating units of the project to calculate the assembly rate according to the construction drawing design documents, image records and relevant completion acceptance data, and complete the evaluation at the completion stage of the precast building.

The Office of Taizhou Construction Industrialization Expert Committee (hereinafter referred to as the “Special Committee Office”) selects at least 3 experts from the Taizhou Construction Industry Expert Database (construction industrialization) to form an expert review team, and the construction unit assists in organizing the review meeting.

Article 8 For precast buildings that have passed the pre-evaluation at the design stage, the local construction engineering quality supervision organization of the project shall strengthen the supervision and inspection of whether each responsible subject of the precast building project complies with the construction drawing design documents, and the project quality supervision report shall include the implementation of the precast building project.
.

2.

For public buildings with a total aboveground floor area of less than 5000 square meters, the construction unit may not organize expert review after submitting supporting materials and making a commitment to the authenticity of the precast building technical scheme and the assembly rate calculation.

After the technical scheme of precast building of the project is determined, the construction unit shall provide the Taizhou Precast Building Evaluation Form (Pre-evaluation at the design stage) (see Annex 1 for details).