[Research results] Standard room type and general components of precast affordable housing
Room type optimization: use function optimization, flexible large space, zero walkway in the sleeve, reduce self shielding, improve ventilation in the middle sleeve, maximize the use of southward direction ▼ household demand ▼ flexible large space, ▼ flush south wall, zero shielding, ▼ inner walkway, middle sleeve with ventilation 03 Room type optimization: structural optimization, unified function module, unified bay module, unified component size, reduced external wall change ▼ unified function module ▼ unified room bay 04, room type assembly: the design principle of standard house type template is to meet the diversity of combination through modular design of house type Application description of flexibility and site applicability ■ The area of the suite (only including the shared area of the floor) is controlled at 55/75/95 for the indemnificatory housing project ■ When fine-tuning the area of the suite, it is recommended that the width of the face be unchanged and the depth be adjusted, which may not affect the application of standard components ■ The core barrel module is only a schematic, which can be adjusted according to the individual project, but the size of the stairs can be unified ■ The section of the components of the air conditioner board is unified, The location and length can be adjusted according to the facade form ■ Type I and Type III are designed as side sleeves, and the ratio of suite types is more flexible ▼ Room type modules ▼ Unit combination and splicing series research objectives: room type standardization promotes building industrialization to truly achieve energy conservation and emission reduction.
Fixing Socket Angular End Nail Plate
Research on standard housing types of affordable housing ■ Unification of design standards ■ Modular and modular application system of precast housing ■ Large space flexible separation 01 for standard housing types; more than 80 housing types under construction or reported for construction in early research and research: ① Delivered and under construction research projects: 11 development enterprises, 17 plots of 8 affordable housing bases, with a prefabrication rate of 15-40%; structural systems are mainly precast integral shear walls; ② Case study project in the design stage: 22 plots of 11 development enterprises and 7 guarantee housing bases, the monomer prefabrication and assembly rate is required to be 40% 02.
Authorized source: Zhongfang Building ID: Zhang Jihong, Chief Architect of ShzfArchitects Zhongfang Building, introduced the results of Zhongfang’s Research on Standard Room Types and Common Components of Precast Affordable Housing.