China Precast Magnet

Precast Concrete Accessories

The first batch of precast construction industrial bases in China

Handan Shexian Precast Concrete Demonstration Building Project Handan Shexian Precast Concrete Demonstration Building Project is located in the Green Building Fangzhou Demonstration Park, Dongshan Scenic Area, Shexian County, Handan City, with a total construction area of 233.61 square meters, two floors above the ground, and a seismic fortification intensity of 8 degrees.

In 2017, China’s 22nd Metallurgical Group was recognized as the first batch of national precast building industrial bases.

Click “Beautiful MCC” above to subscribe! Headline News In 2012, China’s 22nd Metallurgical Group was awarded the title of “National Housing Industrialization Base” by the Ministry of Housing and Urban-Rural Development for the first time.

Luluo Tourist Distribution Service Center Project This project is located in Luluo Town, Xingtai County, Xingtai City, with a total construction area of 4653.55 square meters, one floor above the ground (two floors locally), a total building height of 19.5 meters, a cast steel structure, and a seismic fortification intensity of 7 degrees.

Building 4 is constructed in the form of precast steel structure, with 22 floors above the ground and 2 floors underground, with a total construction area of 10850.86 square meters.

In 2010, Dangyu Town, Zunhua City, built a “precast building industrial base” with an annual output of 100000 cubic meters of concrete components.

The project is located in Jiangshui Town, Xingtai County, Xingtai City, where there is the former site of the Chinese People’s Anti-Japanese Military and Political University.

The first floor above the ground is a comprehensive room integrating outpatient service, physical therapy, hotel restaurant, and kitchen.

This project is the first green construction model project in China that uses the core technology of precast concrete and precast steel structure at the same time.

Vanke Jinyu Huafu Project The precast concrete horizontal members (precast stairs) of the Twenty-first Metallurgical Group of China are applied in Vanke Jinyu Huafu Project.
.

The construction project of villagers’ comprehensive service center is an important carrier for the implementation of rural tourism and cultural construction.

This project has a total of 10 individual buildings Building, with a total construction area of 168890.99 square meters, started construction in March 2017.

China Twenty-first Metallurgical Group is a modern comprehensive enterprise integrating the design, research and development, production, installation and construction of precast components.

02 China’s 22nd Metallurgical Group’s precast building system products.

This project is located in Jiangshui Town, Xingtai County, Xingtai City, with a total construction area of 9110.07 square meters, an aboveground construction area of 7507.34 square meters, an underground construction area of 1602.73 square meters, and a total building height of 23.55 meters.

Bubble Panel Pad

The Twenty-first Metallurgical Group of China has set up a precast building research institute, which has carried out in-depth research in BIM technology, PC structure, steel structure, electromechanical module and other aspects, developed precast shear wall structural system products, steel structure-concrete precast structural system products and beautiful rural residential products, and formed core technologies and products with independent intellectual property rights.

The building is about 323.8 meters long from east to west, 87 meters wide from south to north, with a total building area of about 119622 square meters, a total building height of 45.60 meters, one floor underground and ten floors above the ground.

The second to fifth floors are guest rooms, and the sixth floor is a viewing platform.

In 2017, it was listed by the Ministry of Housing and Urban-Rural Development as a science and technology demonstration project, a construction science and technology demonstration project in Hebei Province, a new technology application demonstration project in the construction industry in Hebei Province, and a key project of MCC Group.

Building 6 adopts precast concrete system.

The structural form is cast steel structure.

The structural form is steel frame structure.

There are six floors above the ground and one floor underground.

Located in Jinshan Industrial Park, Dangyu Town, Zunhua, Tangshan, Hebei Province, the National Assembled Building Industrial Base of the Twenty-first Metallurgical Group of China is the first company in the field of precast housing in Tangshan, Hebei Province.

On November 9, this year, the General Office of the Ministry of Housing and Urban-Rural Development of the People’s Republic of China announced the list of the first batch of precast construction demonstration cities and industrial bases: the China Twenty-first Metallurgical Group was recognized as the first batch of national precast construction industrial bases.

The structural form is cast steel structure.

03 China’s 22nd Metallurgical Group’s precast building performance project.

After the completion of the project, it will further enhance the historical and cultural heritage of the town, build a characteristic tourism town, improve the implementation of tourism supporting services, and achieve an overall improvement of urban and rural brands, urban and rural environment, and living standards.

Caofeidian Environmental Protection Industrial Park Project This project is located in the starting area of the Caofeidian Collaborative Development Demonstration Zone in Beijing.

In 2011, the precast shear wall structural system was demonstrated by experts and the seismic fortification intensity was 8 degrees, It was awarded the title of “National Housing Industrialization Base” by the Ministry of Housing and Urban-Rural Development of the People’s Republic of China in 2012, Qi Ji, the former deputy minister of the Ministry of Housing and Urban-Rural Development, awarded the 2013 precast shear wall structural connection technology, which was demonstrated by domestic experts at the 2015 Hebei Provincial Standard Project Review Conference.

After completion, the project will become an important window for the construction of rural spiritual civilization, and inject huge energy into the development of tourism industry chain in the characteristic towns of serous water.

Caoxinzhuang cast steel structure project This project is located in Caoxinzhuang Village, Fengrun District, Tangshan City.

Buildings 1-5 and 7 adopt horizontal precast components such as floors, stairs and balconies.

The total construction area of the project is 20645 square meters, including 13746 square meters of aboveground construction area and 6899 square meters of underground construction area.

There are not only industrial bases, but also precast building research institutes covering precast concrete and precast steel structures, and “beautiful countryside” in many fields, and they also have such lofty enterprises as design, research and development, production, construction and consulting, Let’s take a look at 01 The development of precast buildings of the China Twenty-first Metallurgical Group.

It is the first low-rise cast steel structure rural residence built by the China Twenty-first Metallurgical Group, with a total building area of 356.18 square meters and two floors above the ground.

Related Posts