China Precast Magnet

Precast Concrete Accessories

【 Local News 】 A house with a construction period of one year will be built in two months, and the first precast office building will be

It only took 21 days from the start of the main structure hoisting to the smooth topping out of the main structure, and a five story 18 meter high office building was built in Sujia Lane next to Huangxing South Road Pedestrian Street.

On September 26th, the reporter walked into the precast office building project of Sujiaxiang Taxation Bureau in Tianxin District and visited the renovation of the old city office building in Changsha, which was the first to use precast buildings.

fixing socket

.

Related Posts