China Precast Magnet

Precast Concrete Accessories

3% Non Capacity Reward │ Implementation Rules for Building Area Reward of Precast Construction Projects in Heyuan City, Guangdong Province

Introduction │ Heyuan City: For buildings that meet the requirements of precast construction, a reward of 3% of the building area will not be included in the plot ratio.

magnetic thread disc

The reward building area should be arranged on the first or second floor of the building.

Effective from December 20, 2024, with a validity period of three years.

.

Related Posts