China Precast Magnet

Precast Concrete Accessories

Assembling “smart” manufacturing to provide residents with better living conditions – our city vigorously develops precast buildings to

A building in Xianfengling Concentrated Resettlement Area, Huilongshan Street, Heshan District was lifted from the first floor slab to the top of the third floor in just 7 days.

If the traditional brick and concrete construction method is used, the construction period should be at least 8 months, “said Yu Yuejun, the project leader.

spread anchor

.

Related Posts