China Precast Magnet

Precast Concrete Accessories

Jianyan Yougu MS Modular Assembled Concrete Shear Wall Structure Technology and Pilot Project Passed Expert Demonstration

Recently, a technical demonstration meeting and pilot project demonstration meeting for the MS modular assembled concrete shear wall structure system (hereinafter referred to as the “MS system”) developed by China Construction Research Technology and Shandong Shenggong Green Building Technology Co.

, Ltd.

were held in Zibo, Shandong.

Zhu Limin, Deputy Chief Engineer of China Construction Research and Technology Corporation, Zhou Jian, Assistant General Manager of the Construction Industrialization Division, Zhang Weigan, Chairman of Shandong Shenggong Green Building Technology Co.

, Ltd.

and other personnel related to technology research and pilot projects attended the meeting.

The meeting was organized and chaired by the Shandong Society of Civil Engineering and Architecture.

shuttering magnet profile

.

Related Posts