China Precast Magnet

Precast Concrete Accessories

Partner winning bid news: Hunan partner wins high-rise precast student dormitory project

Realizing that student dormitory floor slabs are not supported is an effective means of reducing the cost of precast structures.

double ended ferrule

The “Smart House” system of the Shared Research Institute has effectively solved this problem by utilizing super floor technology.

.

Related Posts