China Precast Magnet

Precast Concrete Accessories

Technical Express: Construction Plan for Prefabricated Tower Crane Foundation

The second phase resettlement housing construction project in Xiema New Village, Chengnan Industrial Concentration Development Zone, Ziyang City, combined with its own project characteristics, adopts a prefabricated tower crane foundation that saves labor, time, and land, replacing the traditional cast-in-place tower crane foundation, saving 35 days of construction period and 579800 yuan of cost..

The prefabricated blocks for the prefabricated tower crane foundation are prefabricated in advance, and they are directly assembled after entering the site. The assembly can be completed in 2-3 hours, and the assembly time is relatively short..

Magnetic Steel Chamfer

The prefabricated tower crane foundation is reusable and has a lower one-time amortization cost..

After the construction is completed, it can be completely dismantled, with almost no loss during turnover, saving materials and no pollution, fully demonstrating the characteristics of green and environmental protection..

Notice | Payment of 2024 Shanghai Civil Engineering Society Membership Fees.

New movie! New article! Theme promotional video for the 70th anniversary of the establishment of the Shanghai Civil Engineering Society.

The 2023 (04) issue of Shanghai Civil Engineering Science and Technology announced that the Zhan Tianyou Award, the Constructor Award, and the Youth Talent Award have won the title of “Dragon Spanning Tiger Dwelling”.

Disclaimer: Unless original or source is indicated, this article is sourced from the internet and organized by the Shanghai Civil Engineering Society. The copyright belongs to the original author, and we express our gratitude to the original author. If it involves infringement, please contact us to delete or take relevant measures!.

Related Posts