Precast pure steel structure, integrated and coordinated with BIM
This precast project is a precast building under the EPC mode, with a high overall positioning.
The apartment is 92.
97 meters high and adopts a precast pure steel structure with an assembly rate of 86.
8%.
It is the first demonstration project of building industrialization.
.