China Precast Magnet

Precast Concrete Accessories

Guangzhou releases technical guidelines for precast decoration: factory prefabrication 80%+on-site assembly, construction technology needs

In July, the Guangzhou Housing and Urban Rural Development Bureau released the “Guangzhou Precast Decoration Technology Planning and Integrated Design Guidelines (Trial)”.

Spread Anchor

Core requirement: The factory prefabrication rate for integral ceiling modules and integrated systems must reach over 80%, with only assembly and wiring completed on site.

This marks the transition of dress matching decoration from “encouraging pilot” to “standardized promotion”.

.

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *