Research Report on High Quality Development of Precast Buildings in China in 2026 │ Full text download attached

Abstract: The core logic of precast buildings lies in the spatial transfer of construction methods – a large number of on-site operations such as formwork support, steel bar binding, and concrete pouring in traditional construction are transferred to factories for completion.

After the factory processes and produces components such as floor slabs, wall panels, stairs, balconies, etc.

Ferrule Loop Insert

, they are transported to the construction site and assembled and installed through reliable connection methods.

This process can be summarized as “factory manufacturing+on-site assembly”, which essentially involves a fundamental shift in construction methods from the construction site to the factory workshop.

.