How can the brand effectively complete version iteration when the assembly method of “Xinglian Yigong said assembly” comes?
A certain brand of hotel is preparing for a version upgrade.
When presenting the plan, everyone unanimously commented that the rendering looks good.
The construction drawings were provided to the factory, but it was found that many nodes could not be completed.
The design team said that ‘assembly cannot achieve the desired effect’, while the assembly team said ‘this idea is not valid’.
The project is stuck in the middle, with changes to drawings, rework, and re sampling, causing delays in the schedule.
.