China Precast Magnet

Precast Concrete Accessories

Installation process of precast lightweight wooden structure, stage 1

Before construction, it is necessary to ensure that the foundation is flat and the bearing capacity meets the standard.

Concrete foundations or pre embedded steel ground beams should be laid.

Use a level to calibrate during installation, ensuring that the base is level and providing stable support for subsequent structures.

Erection Anchor

.

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *