Engineering Series ⑫ Precast Lightweight Wall Panel (ALC Precast Wall Panel)
According to the engineering layout plan and on-site positioning axis, the technical personnel shall determine and set out the wall control line.
After completion, the project department and the supervision unit shall conduct line inspection.
Mark the building elevation of the floor and conduct a secondary review when installing wall panels at door and window openings.
.