China Precast Magnet

Precast Concrete Accessories

Precast Building | The first station in China to adopt innovative design of underground triple layered assembly has been topped out

The total length of the station is 164.

Lifting Socket

9 meters, and the standard section width is 21.

5 meters.

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *