Full PC precast structural system with a prefabrication rate of over 85% – Foshan 110 kV Hegui (Youwei) power transmission and

The project is located in Nanhai District, Foshan City, with a total construction area of approximately 2649 square meters.

Fixing Socket

Three buildings, namely the power distribution equipment building, pump room, and alarm room, will be constructed within the station.

It is a modern indoor GIS substation, covering civil engineering, electrical equipment installation, and system debugging.

After the completion of the project, it will effectively enhance the reliability of regional power supply and the modernization level of the power grid.

.