Integrated Technology Scheme for Thermal Insulation and Structure of Precast Buildings
In order to fully meet the requirements of the Notice of Gansu Provincial Department of Housing and Urban Rural Development on Strengthening Building Energy Conservation, Green Building and Precast Building Work (Ganjianke 2022-78) for the assembly rate of public buildings in demonstration areas such as Lanzhou City, Tianshui, Jiayuguan, etc.
, the “Fiber Lightweight Concrete Precast Non dismantling Bottom Formwork Reinforced Truss Floor Support Plate”, “LSP Precast Insulation and Structural Integration External Wall Panel” and “HF Permanent Composite Insulation Template” products have been launched.
Comprehensively solve the problem of assembly rate evaluation score less than 50 points in the design of cast-in-place concrete main structure buildings, and achieve:.