China Precast Magnet

Precast Concrete Accessories

Scenic spots in the assembled world: Zhangjiajie college complex building

The precast slab design project fully considered in the calculation table of assembly rate adopts the truss reinforced concrete composite slab with the combination of single and two-way prefabrication.

Why not take Sangzhi tourism as a breakthrough to build the fourth pole of Zhangjiajie tourism? 6.

Fire and water around the four doors: memories of the last domino event that gave birth to Zhangjiajie; 2.

The complex building of Zhangjiajie university is a building with high assembly rate.

In the split scheme stage of the project, the proportion of prefabrication of vertical components in Q1 reaches 35.8%, 15 points will be obtained, while the proportion of prefabrication of horizontal components also reaches 80%, 20 points will be obtained, Q1 total score 35; In Q2, the proportion of non masonry of non load-bearing enclosure wall and internal partition wall reached 100%, 10 points in total; The Q3 part adopts full decoration and pipeline separation as usual projects, which saves costs and does not consider the integration of kitchen and toilet, 9 points; Q4 green building rating score: 4 points; The total score is 58, and the assembly rate reaches 58%, far exceeding the requirements of the evaluation standard of green precast buildings in Hunan Province.

Magnetic Box

Liu Xuesong, please apologize for Zhangjiajie!! Editor: Dayong sister business cooperation: 13974429995..

This node can avoid the need for section steel fixation of precast components in demoulding, transportation, hoisting and other stages.

Zhangjiajie has found another stunning spectacle.

The two-way laminated plates are connected by integral joints, and the joints are in the form of post cast strips; The one-way slab is connected by close fitting, and a two cm chamfer is set to protect the bottom reinforcement as much as possible and prevent air corrosion.

There is such a hair salon in Zhangjiajie!? No exposure, sorry everyone!! 5.

Xiang Yuangang, Zhou Zhensheng…

Zhangjiajie’s new tourism discovery, “shaved” Mawang city is the next “net red” Tianmen Mountain? 3.

The detailed design drawings based on pkpm-pc also meet the standards and requirements and have been highly praised by the construction party and the construction party.

With the architectural style of clear water facade and plain white and elegant architectural style, it is integrated with the natural environment.

(source: pkv Gouli school) popular article recommendations: 1.

Using industrialized architectural techniques, textured fair faced concrete exterior walls and rhythmic architectural appearance, it gets rid of the cold appearance impression of concrete buildings and integrates the people-oriented concept into every detail design.

• Project Name: Zhangjiajie college complex building • floor information: 17 floors above the ground and 1 floor underground, with a total construction area of 33600 M2 • construction location: Yongding District, Zhangjiajie City • types of precast components: laminated floor, precast stairs, precast beams, precast interior wall panels, Precast exterior wall panels • assembly rate: 58% (in accordance with the evaluation standard for green precast buildings in Hunan Province) • deepening design unit: Zhangjiajie Yuanda residential industry Co., Ltd.

• project features: split scheme with high assembly rate.

Get to know Zhangjiajie and pay attention to Dayong sister! Zhangjiajie college complex building is located on the Bank of Lishui river.

Precast slab design of podium building precast slab design of standard floor efficient and convenient primary and secondary beam joint design the common reserved groove is not used at the lap joint of primary and secondary beams, but the mechanical connection joint of primary and secondary beams is adopted.

The designer adopts the mechanical connection mode of truss reinforced concrete composite plate and primary and secondary beams, which greatly increases the efficiency of the project, shortens the construction cycle and saves the economic cost.

The design cycle of the main beam is deepened by the designer, and the detailed drawing of the main beam is automatically generated twice, which greatly reduces the workload of the main beam.

A wave of confessions of corrupt officials in Zhangjiajie, repeatedly reaching the hearts of the people! 4.

Considering the convenience of component processing in the later stage of floor reinforcement, precast slabs are arranged in sequence during reinforcement, which is convenient for automatic processing of mesh machine.

Related Posts