Application of assembly technology in hospital ward
1) 1.0mm thick galvanized steel top groove 2) 3mm thick sound insulation sealing strip 3) dry hanger 4) 100kg / m3 rock wool filling 5) 1.5mm thick galvanized steel vertical system keel 6) steel transverse keel 7) 0.8mm thick galvanized steel panel backing 12mm thick gypsum board 8) system keel adjustment base 9) performance advantages of galvanized steel skirting bottom groove: the combustion performance level of all parts of the product is class A; The fire resistance limit of solid fire partition system is more than 1.5h; High standard selection of environmental protection materials; The product design style is exquisite, concise and modern; Field assembly installation and rapid construction; All structures are connected by fasteners, and there is no cutting and welding process on site; Long service life, cheap disassembly, rapid adjustment of space layout and high investment economy; The system product is particularly significant in the medical clean environment and meets the needs of all aspects of the hospital.
01 assembled sound insulation and fire prevention integrated wall system 89 light steel keel partition system performance advantages of assembled 89 light steel keel partition system: wall + pipeline + decoration are integrated to realize assembly integration; Using three-dimensional information technology, prefabricate pipeline holes and standardize on-site construction operations; Green materials, low emission and reduce environmental pollution caused by construction; Keel components are precast in the factory, modular assembly and installation on site, and the full dry method construction efficiency is higher; Flexible safety structure, excellent seismic and vibration reduction performance; All structures are connected by fasteners, and there is no cutting and welding process on site; Light wall reduces building load and has excellent sound insulation and fire prevention performance; Compared with traditional wall, it has higher cost performance; Schematic diagram of process nodes class a fireproof integrated wall system steel partition system steel partition system, also known as sheet metal partition system, is a standardized product of wall panels customized and bent according to the on-site dimensions after the surface treatment of steel plates; The unique decorative buckle connection mode is adopted, which is simple and convenient for installation, without nailing or gluing, stable and reliable connection, and can be disassembled and recycled.
Fabricated interior system, including partition wall, wallboard, floor, ceiling and integral toilet; With standardized production and modular installation, the factory prefabrication rate and on-site assembly rate reach 80%, which significantly improves the construction efficiency and shortens the construction cycle.
With the continuous development of modern industry, lightweight materials, process assembly and integration have gradually become the development trend of building interior decoration.
The surface layer can be constructed with various materials according to the design requirements, with high construction efficiency and controllable overhead height of 5cm-25cm; 04 assembled integrated bathroom system assembled BIM system improves the quality of design drawings and collision check – accurately model the integration of electromechanical pipelines and indoor decoration, reflect the collision location and put forward optimization schemes; Three dimensional design – convert the drawing from two-dimensional to three-dimensional, visually display the spatial relationship, and reduce design errors and changes; Construction method optimization – simulate the actual construction error and construction operation space to optimize the drawing process construction method; Acceptance criteria – Visual criteria for stop point acceptance through three-dimensional simulation of phased construction status in the construction process.
Process node partition wall and top connection node partition wall and ground connection node single wall horizontal node partition wall horizontal node 02 ¢ the cast sheet metal ceiling system adopts the hook up installation process, with large size and specification of steel ceiling, beautiful and generous overall effect, rich surface texture and short construction cycle; Pipeline maintenance is convenient, and the surface color effect is diverse; 03 the cast overhead ground system adopts ABS high-strength support overhead base plate, 20mm cement fiber board, 18mm glass magnesium board and 18mm OBS directional particleboard can be used for base leveling, 8mm cement fiber board can be laid at staggered joints and the ground overhead can be completed.
Double Head Lifting Pin Anchor
Click the picture to view the details.
3D construction , improve construction management efficiency , optimize construction methods , improve construction management efficiency source: Shandong shengfulai Industrial Co., Ltd.
Improve the efficiency of construction management — layout of production material structure (masonry, surface materials and structural structure), guide the construction, control the typesetting loss rate within a reasonable range, reduce cutting surplus materials, and eliminate the over picking and wrangling of materials supplied by Party A in the later settlement; three-dimensional construction – form a 3D file of structural nodes, and workers use convenient equipment to guide the construction according to the on-site nodes; process scene – form process animation for key and difficult parts of the construction to prevent reverse construction Sequential construction.
The overall solution of cast interior decoration provides: cast partition system, wall facing system, ceiling system, ground system and bathroom system.
Optimize the bill of quantities optimization list – identify the bidding list of our company, form the four major project lists of civil engineering, fine decoration, primary electromechanical and secondary Electromechanical, automatically extract the required quantities according to the set list calculation rules, and directly quote to the construction unit.
There are rich choices and collocations of facing materials and styles, including stone grain, wood grain, wallpaper, wall cloth and coating board, to meet various types of decoration styles and design needs.
This trend will become more obvious with the progress of the construction industry.