Lingang Junior High School Project Completed First Piece PC Component Hoisting

On March 4th, the Lingang Junior High School project successfully completed the first piece of PC component hoisting, marking a new chapter in the construction of the main structure and firing the first shot of a comprehensive sprint after resuming work and production..

The PC component being lifted this time is the first floor column of Public Complex Building 3. Compared with traditional construction methods, using prefabricated components can not only maximize the improvement of common quality problems such as cracking and leakage, ensure project quality, but also increase the construction speed by about 30% and accelerate the progress of the project. To ensure the smooth lifting of PC components, the project strictly implements the requirements of refined management, conducts multiple rounds of training and briefing for the personnel involved in the operation, and imposes strict requirements on the production, first piece acceptance, transportation, on-site acceptance, lifting, and other aspects. A dedicated person is arranged to be on duty during the lifting process, ensuring that the lifting work is flawless..

Fixing Socket Angular End

The Lingang Junior High School project is located at the intersection of Mianling Road and Qunfeng Road in Nicheng Town, Lingang New Area. The total construction area is about 45000 square meters, of which the above ground construction area is about 33000 square meters and the underground construction area is about 12000 square meters, with a total of 7 building units built. The main structures of the No.1 ordinary teaching building, No.2 experimental building, No.3 public comprehensive building, and No.4 administrative building all use prefabricated components, and the prefabrication rate of each individual building is around 40%. As an important component of improving the basic education resources of the heavy equipment industry zone in the Lingang New Area, the project can accommodate 1800 students after completion and will also serve as an important support for attracting talents in the future of the Lingang New Area..

Related Posts