1212 | What are the key control points for prefabricated buildings? A set of data covering assembly style full process management |

Prefabricated buildings have undergone rapid development in China and are now widely used in various regions..

Many regions have mandatory requirements. For example, in my province, it is currently mandatory for all projects to have an assembly rate greater than 50%..

Regarding assembly rate, the calculation rules for assembly rate need to be thoroughly studied. The assembly rate calculation rules vary in each region, so it is important to choose the most suitable assembly rate calculation rule for oneself. There are many doorways inside, and I’ll throw a brick:.

In some regions, the assembly rate is calculated based on area, while for horizontal components and stairs, the assembly rate is calculated based on the horizontal projected area. By increasing the assembly rate by 1%, the volume of prefabricated components for stairs is more than three times that of laminated panels, and the cost of prefabricated components is much higher than that of cast-in-place components..

The tower crane used in general projects does not support directly lifting the entire staircase at the farthest end. A staircase often needs to be installed in two pieces, but whether it is transverse or longitudinal, their joint positions cannot be handled. Yes, it cannot be processed. It can be clearly seen from the appearance: pay attention to the height of the ladder steps at the segmented position when cutting horizontally, and look at the splicing at the junction position when cutting vertically..

Even if the prefabricated design is done well, the probability of water leakage at the interface position is extremely high!.

I won’t go into much else, I have prepared a set of matching materials. If you are interested, you can download and learn on your own..

The construction industry continues to suffer from internal competition, and I will contribute a move to help you become the king of competition.

1209 | EPC Management Information Gift Package: Construction Organization Design, Real Cases, Training Courseware, Videos, and Ability Building in One Stop! Over 200 high-quality files.

Magnetic Box Adapter

1039 Prefabricated Reinforced Concrete Shear Wall Structure Training. ppt | 124 pages available for download!.

Control of the whole process of prefabricated construction (Page 102, essence version).

Previous Review: Introduction to a New Prefabricated Foundation Pit Support Technology.

1. Click to read the original text and join [52 Construction] Knowledge Planet for acquisition.

3. The content is sourced from the internet. If there is any infringement, please contact us to delete it..

Related Posts