China Precast Magnet

Precast Concrete Accessories

55% of precast buildings, and Beijing Economic Development Zone plans to issue implementation opinions on the development of precast

*** Practice the concept of green development, promote the innovation of construction methods, vigorously develop precast buildings, save resources, protect the environment, reduce pollution, provide healthy, applicable and efficient use space for people, and build high-quality buildings with harmonious coexistence between man and nature according to the economic and social development level of the Economic Development Zone and the principle of adjusting measures to local conditions and economic applicability, Accelerate the construction of a green new city suitable for Industry and living.

(II) work objectives during the 14th Five Year Plan period, the tasks will be completed in strict accordance with the requirements of Beijing assembly.

The implementation opinions of Beijing Economic and Technological Development Zone on the development of precast buildings (Exposure Draft) in order to comprehensively and steadily promote the development of precast buildings and realize the high-quality development of the construction industry in the economic and Technological Development Zone, in accordance with the guiding opinions of the general office of the State Council on vigorously developing precast buildings (GBF [2016] No.

The responsible subjects of all parties involved in the design, construction and operation of the project shall abide by the relevant provisions of the implementation opinions.

Log in to the website of Beijing Municipal People’s government( http://www.beijing.gov.cn ), put forward opinions in the column of “solicitation of opinions on policy documents” under the section of “interaction between government and people”.

The factory buildings and warehouses on the newly-built industrial land shall adopt precast buildings.

By 2025, the proportion of precast buildings in the new construction area will reach more than 55%.

The newly approved new buildings invested by the government, new public buildings, industrial buildings and other buildings within the scope of implementation shall meet the standard of assembly rate of no less than 50%..

15, Ronghua Middle Road, Beijing Economic and Technological Development Zone (please indicate “opinion collection” in the envelope) 3.

8) are formulated in combination with the actual development of precast buildings in our district.

Beijing Economic and Technological Development Zone Management Committee January 19, 2022 Abstract: during the 14th Five Year Plan period, the tasks were completed in strict accordance with the requirements of Beijing assembly.

Now it is open to the public for comments.

Email: bdakfjs@163.com2 Mailing address: development and Construction Bureau, No.

71) and the implementation opinions of the general office of Beijing Municipal People’s Government on accelerating the development of precast buildings (jzbf [2017] No.

3.

Time for public solicitation of opinions: January 21 to January 28, 2022.

8), and in combination with the actual development of precast buildings in the economic development zone, The administrative committee of Beijing Economic and Technological Development Zone has drafted the implementation opinions of Beijing Economic and Technological Development Zone on the development of precast buildings (Draft for comments).

1.

By 2025, the proportion of precast buildings in the new construction area will reach more than 55%.

4.

Among them, the newly established public buildings with a single aboveground building area of more than 10000 square meters (including) invested by the government should adopt steel structure buildings.

Flat End Socket Cross Pin

In 2021, the proportion of precast buildings in the new construction area will reach more than 35%, and promote the formation of a number of EPC enterprises with modern assembly and construction level and corresponding professional skill teams integrating design, large-scale production and construction of parts and components.

(3) Implementation scope the implementation opinions are applicable to the projects within the scope of Yizhuang new town.

5.

Tel.: 010-678802814, fax: 010-678801875.

In 2021, the proportion of precast buildings in the new construction area will reach more than 35%, and promote the formation of a number of EPC enterprises with modern assembly and construction level and corresponding professional skill teams integrating design, large-scale production and construction of parts and components.

(4) The implementation standard of precast buildings shall comply with the relevant national and municipal standards, and the assembly rate shall meet the requirements of the evaluation standard for precast buildings (DB11 # t1831-2021): 1 New affordable housing and policy housing projects and commercial housing development projects that obtain the use right of state-owned land by bidding, auction and listing shall meet the standard of Grade A (BJ) (the assembly rate shall not be less than 60%); 2.

Commercial housing development projects with state-owned land use rights obtained by bidding, auction and listing shall adopt precast buildings.

New public buildings shall be cast buildings.

The newly established buildings invested by the government shall adopt precast buildings.

6.

The feedback channels are as follows: 1.

All sectors of the society are welcome to put forward their opinions and suggestions.

The full text of the announcement of the Management Committee of Beijing Economic and Technological Development Zone on soliciting public opinions on the implementation opinions of Beijing Economic and Technological Development Zone on the development of precast buildings (Draft for comments) is issued to comprehensively and steadily promote the development of precast buildings and realize the high-quality development of construction industry in the economic and Technological Development Zone, In accordance with the guidance of the general office of the State Council on vigorously developing precast buildings (GBF [2016] No.

2.

Within the scope of the above facts, public construction projects with a single building area of less than 5000 square meters, structures and supporting ancillary facilities of construction projects (garbage room, power distribution room, etc.) Construction projects with special technical conditions that are not suitable for the implementation of precast buildings (subject to the demonstration of the municipal precast building expert committee and the approval of the municipal precast building joint conference office).

71) The implementation opinions of the general office of Beijing Municipal People’s Government on accelerating the development of precast buildings (jzbf [2017] No.

Precast buildings shall be adopted for new affordable housing and policy housing projects.

Related Posts