TheuseofBIMtechnologyinprecastbuildingscaneffectivelyreducetheproblemsofslowconstructionprocessandlowresourceutilizationefficiency,andcaneffectivelyimprovetheefficiencyofprecastbuildingdesign,prefabricationproductionandconstructionoperations.

Based on these characteristics of BIM Technology, it can give full play to its greatest advantages in standardized design, engineering production of components and parts, assembly construction, business informatization of production and centralized production of projects..

Foreword the use of BIM Technology in precast buildings can effectively reduce the problems of slow construction process and low efficiency of resource use, and can also effectively improve the efficiency of precast building design, prefabrication production and construction operations.

Using BIM Technology can digest design schemes faster, find technical problems faster, sort out engineering data faster, and be used for production planning, material preparation, progress control, etc.

We hasexperienceinthelifecycleapplicationofbuildinginformationmodelBIMintheprecastconcretePCindustry,andhasmorethantenyearsofpracticalprojectapplication.

Liaoning Aoji Construction Technology Co., Ltd.

The integration of bim+erp (SAP) system is used to realize the management control of design, production, transportation and construction.

UsingBIMtechnologycandigestdesignplansfaster,findtechnicalproblemsfaster,andsortoutengineeringdatafasterforproductionplanning,materialpreparation,andprogresscontrol.

Next, the application value of Bim in PC is introduced.

UtilizetheintegrationofBIM+ERP(SAP)systemtorealizethemanagementcontrolofdesign,production,transportationandconstruction.Next,theapplicationvalueofBIMinPCisintroduced.

has the life cycle application experience of building information model Bim in the precast concrete PC industry, and has more than ten years of practical project application.

If hidden dangers are found, BIM Technology will issue warnings in time, and solve the problem as quickly as possible by contacting the designers; Finally, BIM Technology can also promote the connection between various construction parts, strengthen the connection between each other, form a whole, timely inform each part of the tasks in charge, and regularly check the completion of these tasks to see if they are consistent with the contents of the plan.

Scan the QR code below to pay attention to our 01 company profile.

In the actual construction and installation process, if the actual situation changes and the construction members want to change the model, the operators do not need to overturn the model and then rebuild it, but only need to change a few variables, so that the whole model can become what they want, saving human and material resources, and avoiding possible problems in the reconstruction process, Which leads to the extension of construction time; Thirdly, in terms of inspection, after the model is established, BIM Technology can assist the construction personnel to check any possible hidden dangers before the formal commencement, so as to minimize the construction risk.

Spread Anchor

BIM Technology is widely used in precast buildings.

If there is any deviation, it will contact the relevant responsible personnel to do a secondary inspection, which can greatly improve the work efficiency, So that the whole construction process can be carried out in an orderly manner.