How to do a good job of deepening design before the construction of precast buildings?

Disclaimer..

In case of any conflict found in the detailed drawing, it is necessary to point out the improvement in time so that the designer can modify it in time.

The thermal insulation structure shall meet the functional requirements of the building.

(2) External wall energy conservation and thermal insulation structure.

(2) Check the details of precast components to ensure that they meet the specification requirements and installation requirements.

2、 Complete the detailed design content (1).

What should we do well in this link? 1、 Master the detailed design requirements (1) The detailed drawing of precast components shall be prepared according to the reservation and burial requirements of various disciplines and production and construction.

At the same time, the design performance shall be checked, and the design calculation and verification process shall be completed.

(2) The construction party of the mold scheme shall ensure that the drawing design meets the construction needs, and shall, according to the drawings, cooperate to check whether there are problems in the mold production scheme, and propose modification suggestions as soon as possible.

(5) The storage and transportation scheme is available when needed, and the reduction of transportation distance is a strong guarantee to ensure the saving of land for assembly installation.

During the detailed design of exterior wall facing, attention shall be paid to the detailed layout drawings of face bricks, decorative concrete, stone materials, etc., and the type and amount of materials shall meet the design requirements.

3、 Focus on the detailed drawings (1) Node ● Vertical joint assembly details of wallboard; ○ Assembly details of horizontal joints of wallboard; ● Floor joint assembly details; ○ Detailed drawing of stair installation node; ● Detailed drawing of balcony plate installation node; ○ Detailed installation node drawing of air conditioning panel; ● Detailed drawing of installation node of assembly plate; ○ Detailed drawing of partition board installation node; ● Detailed drawing of beam column installation node.

Attention shall be paid to the selection of thermal insulation materials and connectors to ensure the accuracy of the layout details.

Ring Clutch

4、 Attention shall be paid to the production of precast components (1) The construction party shall participate in the design and adjustment of the production plan of precast components in a timely manner according to the requirements of the drawings to ensure the stable operation of the production of components.

(4) Technical quality control measures The quality of components has a great impact on the later assembly and installation construction, and attention should be paid to timely communication with component manufacturers.

(3) Personnel shall organize and assign special personnel to control the quality of component fabrication to ensure that the strength meets the standard, the size is appropriate, and the appearance is appropriate; The specially assigned person shall be responsible for communicating with the component factory on behalf of the construction party, timely feeding back the production situation, and communicating the demand of the construction for the component.

The component strength shall be tested in time, and it shall be redone in time if it does not meet the installation requirements; If the difference between the size and the actual requirements is too large, the manufacturer should also be contacted in time to correct the deviation.

The construction party shall understand the relevant standards and specifications of assembly type, and check whether the content and depth of the detailed drawing of precast components meet the requirements of precast components manufacturing, quantity statistics and installation construction during the detailed design.

At the same time, the procurement of stone materials shall meet the requirements of aggregate strength and beautiful finishing.

During the construction of precast buildings, the construction unit is not the last one to participate.

In the deepening design stage of precast components, the construction unit should deepen the design of component drawings according to the actual situation to meet the later construction needs.

(2) Processing ● Precast component template drawing; ○ Reinforcement drawing of precast components; ● Drawing of reserved and embedded parts of precast components.